background image

 
 
 

 

Hana Model #1012 

 

 

P

LEASE 

R

EAD 

T

HE 

F

OLLOWING 

I

NSTRUCTIONS

 

 

C

OMPLETELY 

B

EFORE 

B

EGINNING

 

Our goal is to ensure that your installation goes smoothly and safely. Please read these 
safety instructions carefully and follow the recommendations for plumbing and 
mounting. 

If, after reading this instruction manual, you determine you do not have 

the necessary skills and/or tools, we then recommend a licensed plumbing 
contractor complete the installation. 

 

You will need the following tools:

 

Soft pencil or felt pen to mark tile 
Tape Measure 
Level 
Drill (Preferably cordless)  
 

A Reciprocating Saw w/metal cutting blade 
(Sawzall

®

Channel Locks or adjustable wrench 
¼”

 

Masonry Drill Bit 

 

New Construction/Extensive Remodel 

New Finished Wall Surface

” 

 

1.

 

Prior to sheetrock, stub-out ½” hot and cold supply lines beyond the finished wall 
surface, 6” on center. The height of the stub-outs is completely dependent upon the 
desired mounting height of the Hana

®

 Showerspa. For a person 5’8” – 6’2” we 

recommend the stub-outs be 39” from the finished floor height.

1

   

2.

 

After the finished wall surface has been completed, make certain the water is completely 
turned off to both hot & cold supply lines of the Shower. Connect the 90° male threaded 
fittings to the stub-outs maintaining ¼” –  ½”   space between the fitting and finished 
wall. The open end of the threaded male fitting should point down.

  

3.

 

Mark the location of the mounting holes for the bracket making sure the bracket is level. 
For a person 5’8” – 6’2” tall, we recommend 43½” from finished floor height

2

.  Before 

drilling holes for the bracket, make certain the Showerspa will rest flat against the 
finished wall surface at the desired mounting height with the supply lines connected. 

4.

 

Drill ¼” holes through the wall surface using a masonry bit. Drill slowly through wall 
surface to avoid cracking and chipping. Insert anchor and securely screw bracket to wall. 
Before connecting hot and cold supply lines, mount the Showerspa on the wall, checking 
the height, and making sure the Showerspa feels secure. 

5.

 

Connect hot and cold water supply lines to male threaded pipe. Do not over-tighten. 
Before mounting the Showerspa, check the fittings to make sure they are secure. Turn on 
water and check for leaks. When fittings are leak-free mount Showerspa on wall. 

6.

 

Seal around the body of Showerspa with a bead of silicone.

 

                                                 

1

 The desired mounting height of the Showerspa determines the height of the ½” stub-outs.  The stub-outs 

must be located at a height allowing the supply lines to be connected and the body of the Showerspa to rest 
flat against the finished wall. 

2

 This height may vary depending on several factors (i.e. location of supply lines, personal preference, etc.).  

 

Отзывы: