www.pulsar.pl
HPSB20A12C
GREEN POWER
6
Table 4. Operation safety
Protection class PN-EN 60950-1:2007
I (first)
Protection grade PN-EN 60529: 2002 (U)
IP20
Electrical strength of insulation:
- between input and output circuits of the PSU (I/P-O/P)
- between input circuit and PE protection circuit (I/P-FG)
- between output circuit and PE protection circuit (O/P-FG)
3000 V/AC min.
1500 V/AC min.
500 V/AC min.
Insulation resistance:
- between input circuit and output or protection circuit
100 MΩ, 500V/DC
Table 5. Operating parameters
Operating temperature
-
10ºC...+40ºC (see: chart 1)
Storage temperature
-
20ºC...+60ºC
Environmental class
II
Relative humidity
20%...90%, without condensation
Vibrations during operation
unacceptable
Impulse waves during operation
unacceptable
Direct insulation
unacceptable
Vibrations and impulse waves during transport
According to PN-83/T-42106
Chart 1. Acceptable output current from the PSU depending on ambient temperature.
2. Installation.
2.1 Requirements.
The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for
230V/AC installations and low-voltage installations (required and necessary for a given country). The device shall
be mounted in confined spaces, according to the environment class II, with normal air humidity (RH=90% max.
without condensation) and the temperature from -
10°C to +40°C. The PSU shall work in a vertical position that
guarantees sufficient convectional air-flow through ventilating holes of the enclosure.
Before installation, prepare a PSU load balance:
1. Output current 18A + 2A battery charge
*
2. Output current 16A + 4A battery charge
*
3. Output current 12A + 8A battery charge
*
Total device c battery: 20A max
*
.
As the PSU is designed for a continuous operation and is not equipped with a power-switch, therefore an
appropriate overload protection shall be guaranteed in the power supply circuit. Moreover, the user shall be
informed about the method of unplugging (usually through assigning an appropriate fuse in the fuse-box). The
electrical system shall follow valid standards and regulations.
*
Refer to chart 1