![Pulsar Measurement FlowCERT Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/pulsar-measurement/flowcert/flowcert_instruction-manual_1625413028.webp)
FLOWCERT LITE (UL) INSTRUCTION MANUAL
28
Preparation for Operation
Before switching on, check the following:
✓
FlowCERT Lite
is mounted correctly and is in a ‘safe’ area.
✓
The power supply is correctly installed.
✓
The voltage selector switch is in the correct position.
✓
The relays are connected correctly.
Maintenance
There are no user serviceable parts inside FlowCERT Lite, except the mains
fuse. If you experience any problems with the unit, then please contact
Pulsar Measurement for advice.
To clean the equipment, wipe with a damp cloth. Do not use any solvents on
the enclosure.
Important Information
The unique DATEM software comes into operation as soon as power is
applied and is designed to monitor a
moving level
or
target
with the
transducer
in a
fixed position.
If, after any period of use, it should become necessary to move the
transducer, for any reason, from its original operating position, switch off
the FlowCERT Lite, before proceeding, in order to prevent any undesirable
updates to the DATEM trace. If after moving the transducer the reading is
not as expected, please refer to Chapter 8 Troubleshooting.
Содержание FlowCERT
Страница 1: ...FlowCERT Lite UL Instruction Manual...
Страница 2: ...2...
Страница 14: ...FLOWCERT LITE UL INSTRUCTION MANUAL 14 EU Certificate of Conformity...
Страница 142: ...FLOWCERT LITE UL INSTRUCTION MANUAL 142 NOTES...