
Operation, Calibration & Service Manual
LinkBelt - DS350 1334 Console
7
SERVICE AND MAINTENANCE
Daily maintenance of the Load Moment Indicator consists of inspecting:
1. The electrical wiring connecting the various parts of the system.
If electrical wiring is damaged, it shall be replaced immediately.
2. If the insulation is worn on the electrical wiring or cable guides are damaged, these parts shall be
replaced.
3. Check the anti two-block limit switches for freedom of movement.
Other than correcting the problems identified in the Malfunctions Table and replacing faulty
mechanical parts and cables, no other repairs shall be performed by non-expert personnel.