
Operation, Calibration & Service Manual
LinkBelt - DS350 1334 Console
The use of load or angle sensor bypass plugs for pile driving applications will render the system
inoperable from proper function and operation, and is not recommended. But, the option is
available to prevent momentary cutout conditions due to spiking load indications that may occur or
interfere with the pile driving application. After performing this application, the system must be
returned to its normal working condition with all sensors connected, and bypass plug removed. The
pre-operation inspection and calibration verification in SECTION 6 of this manual
MUST
be
performed.
4
CONFIGURATION SETUP
The LMI setup procedure allows the operator to input the crane configuration using interactive
displays. The operator must complete the configuration setup procedure for the Load Moment
Indicator system by confirming (pressing OK) to set the system into operation or deleted (pressing
DEL) to enter a new configuration. The previous configuration setup will be displayed shown in bold
symbols and must match the current crane operating configuration.
Pile Driving Application
To prevent momentary cutout conditions due to spiking load indications that may occur or interfere
with the pile driving application, electrically disconnect the force transducer from the junction box and
install the bypass connector F9L0050 (031-300-060-2
52) in it’s place. Remove the force transducer
and replace with link J5M0216 in main pendant to replace the length of force transducer.
LMI Setup Procedure
...starts:
manually
after each modification of the crane configuration by
pressing "SEL" (9) button.
...is operated:
by answering the different questions using functional buttons F1...F4
in accordance with the actual configuration of the crane.
...is cancelled:
any time by pressing again the "SEL" (9) button. The system,
however, is only ready for operation, if the procedure has been
completed and the selections have been confirmed.