background image

PSP Products, Inc.  |  8618 Phoenix Drive  |  Manassas, VA 20110  |  pspproducts.com  |  1-800-648-6802  |  [email protected]

Revised: 10/8/2021

PSP Products, Inc.  |  8618 Phoenix Drive  |  Manassas, VA 20110  |  pspproducts.com  |  1-800-648-6802  |  [email protected]

Important: Risk of electrical shock. This device 

should only be installed by qualified personnel.

Hurricane 2000 Series - Three Phase

Service Entrance Rated Type 1 - UL 1449 4th Edition

Installation Instructions

 

1.  Turn off all power supplying this equipment.
2.  Confirm device is rated for your system by 

comparing voltage specifications on the product 

label.

3.  Install according to your specific installation using 

the diagrams below for examples.

4.  Install on 20A-60A breaker. Verify lug on breaker 

provides solid connection to SPD wiring.

5.  Install in accordance with article 280 of the 

National Electric Code.

6.  Confirm that the electrtical terminals used 

to attach this device are identified for these 

conductors.

7.  Twist conductors 1/2 turn or more for every 12 

inches of length.

8.  Keep conductor length as short as possible with 

no sharp bends or kinks.

9.  Do not loop or coil wires.
10. Ensure a high quality ground is in place. 

Diagram D Type 1

Main Panel

(Breaker Not Required)

Diagram “A” Type 2

Main Panel

(Breaker required)

Diagram “C” Type 1

Disconnect

(Breaker not required)

Diagram “B” Type 2

Main Panel (3-way connector)

(Breaker required)

Diagram E Type 1

Generator Transfer Switch

(Breaker Not Required)

N

Neutral

Ground

Neutral

Load 

connection

Ground

Diagnostic Operation

 • LED ON = Normal operation
 • LED OFF (one or more) = Fault, check phase, check 

voltage & connections. If OK, replace unit. 

 • Audible Alarm ON = check phase

3.46”

4.

02”

Neutral

Gr

ound

Optional Connection:

SPD may be connected to

LINE or LOAD side of ATS

GEN  LINE

LOAD

LINE

Ground

Neutral