![PRÜFTECHNIK VIBXPERT II Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/pruftechnik/vibxpert-ii/vibxpert-ii_operating-instructions-manual_1621896064.webp)
3-14
VIBXPER
T II 05.2012
Preliminary remarks
In principle, a machine template is set up like a route and resembles
a route in operation and workflow (see previous section). The differ-
ences to a route are described in the following points:
Machine description
This must be identified with a name before the first measurement.
Additional data for documentation purposes (such as serial number,
model, customer, and tester) can also be entered.
Production test
During a production test, the automatic call up of the next measure-
ment task is deactivated. In this way it is possible to carry out the
same measurement task under different operating conditions within
the scope of a production test. The remaining measurement tasks are
called up manually.
To create a template for a production test, the ‘Production test’ option
must be activated in the OMNITREND template editor (see below).
In the case of templates for production tests, the measurement loca-
tion hierarchy on the machine is only shown in the tree view. A list
view is not available. The number of measurements carried out for
each measurement location and measurement task appears instead of
the status information.
Left:
Template for 'Production test'
and selection of the meas. task
Number of measurements per task
(in this case: 1.0 = 3 meas. / 3 tasks)
Number of measurements
(here: 2 / 1 / 0)
Measurement - Machine template
Right:
‘Production test’ option
in the OMNITREND template editor
Содержание VIBXPERT II
Страница 175: ......