Fibre to SAS/SATA RAID Subsystem
56
User Manual
15.
Insert the 2 power supply modules.
16.
Open the top cover and re-insert the disk drives / disk trays, if disk drives/disk
trays were previously removed. Then close the top cover.
17.
Use four (4) M5 screws to lock the enclosure into the rack post.
Front Left Side Front Right Side
Содержание EP-4423
Страница 1: ...Fibre to SAS SATA RAID Subsystem User Manual Revision 1 0...
Страница 67: ...Fibre to SAS SATA RAID Subsystem User Manual 67...
Страница 68: ...Fibre to SAS SATA RAID Subsystem 68 User Manual...
Страница 69: ...Fibre to SAS SATA RAID Subsystem User Manual 69...
Страница 70: ...Fibre to SAS SATA RAID Subsystem 70 User Manual...
Страница 71: ...Fibre to SAS SATA RAID Subsystem User Manual 71...
Страница 80: ...Fibre to SAS SATA RAID Subsystem 80 User Manual NOTE Cannot expand Raid Set when contains Raid30 50 60 volume...
Страница 133: ...Fibre to SAS SATA RAID Subsystem User Manual 133 12 Select Yes again to confirm The RAID controller will restart...
Страница 154: ...Fibre to SAS SATA RAID Subsystem 154 User Manual 10 Carefully push the thumbscrew handle until the lock is engaged...
Страница 158: ...Fibre to SAS SATA RAID Subsystem 158 User Manual 6 Replace the front panel 7 Reconnect the cable to the front panel...