
5: Installing New Components
61
5.2 Installing an Additional Ethernet Board
To install an additional Ethernet board, use the following procedures:
5.2.1 Installing the Hardware
1. Shut down and power off the Freeway using the procedure described in
.
2. Unplug the power cord(s) from the back of the Freeway cabinet.
3. Slip the anti-static strap around your wrist and attach the alligator clip to any bare
metal area of the Freeway cabinet.
4. Remove the top cover of the cabinet as described in
.
5. Remove the board support bar by removing the screw at each end of it that holds
it to the cabinet and lifting the bar out of the way.
6. Remove the Ethernet board from its static protection packaging.
7. Slide the Ethernet board into the empty slot.
Caution
Be very careful when inserting a printed circuit board to prevent
damage to the connectors and avoid causing incorrect power
distribution due to a misaligned board.
8. Seat the board by applying pressure evenly to the top of the board.
9. Tighten the screw near the Ethernet board’s face plate.
10. Replace the board support bar and tighten the screws that secure it in place.
11. Replace the top cover on the cabinet and tighten the screws that secure it in place.
Содержание Freeway 3414
Страница 5: ...Contents DC 900 2031A 5 A Hardware Specifications 65 B Packing the Freeway for Shipment 67 Index 69...
Страница 6: ...6 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 8: ...8 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 10: ...10 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 14: ...14 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 16: ...16 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 35: ...2 Maintaining the Freeway Cabinet DC 900 2031A 35 Figure 2 5 Fan Tray Assembly...
Страница 45: ...4 Replacing Freeway Components DC 900 2031A 45 Figure 4 2 Freeway 3414R Rear View...
Страница 49: ...4 Replacing Freeway Components DC 900 2031A 49 Figure 4 4 CD DVD Drive Bay...
Страница 54: ...54 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 64: ...64 DC 900 2031A Freeway 3414 3414R Hardware Maintenance Guide...
Страница 72: ...Protogate Inc Customer Service 12225 World Trade Drive Suite R San Diego CA 92128...