
4.13
•
after unloading a lot where there is an old box, clean the residual material from the
load box edge, the walls and wall extensions,
•
close and secure the walls and wall extensions or chute opening,
•
before moving off make sure that tipping pin are in correct position, i.e. with the handle
facing downward and secured with cotter pin - see figure (4.2A).
DRAWING 4.2A CORRECT METHOD FOR INTERLOCKING TIPPING PIN
(1) tipping pin (2) securing cotter pin
Содержание T780
Страница 2: ......
Страница 5: ......
Страница 17: ...1 10 ...
Страница 29: ...2 12 DRAWING 2 2A STICKER LOCATIONS Labelling in line with table 2 1 Information and warning stickers ...
Страница 43: ...3 14 ...
Страница 72: ...5 13 DRAWING 5 6A CHASSIS GREASING POINTS ...
Страница 73: ...5 14 DRAWING 5 7A LOAD BOX GREASING POINTS ...
Страница 80: ...5 21 ...
Страница 81: ...NOTES ...
Страница 82: ... ...