The initial setup tasks covered in this document are described in three general categories:
• Hardware Setup:
This includes mounting the 1U server in a standard equipment rack. Connecting the
cables needed for data flow and device management, connecting the power, and then powering on the
devices.
• Cluster Setup:
This covers changing the network settings for the external public network and internal
Cluster (private) interfaces, configuring storage settings, node configuration, cluster management, and
license activation.
• Virtual Storage Management
: This covers use the
Virtual Storage Creation Setup Wizard
for setup.
Once you have completed this task, you are ready to configure the virtual storage to suit your preferred
application.
HARDWARE SETUP
U
npacking
Each VSky package contains the following items:
•
VSky A1100
•
Quick Start Guide
• Two 1.5m (4.9 ft) Power cords
• Sliding rail assembly for rack mounting and associated hardware
•
Front panel bezel cover
6
VSky A1100 Product Manual
Promise Technology, Inc.