Maintenance manual Universal-1000
P R O M E T A L
33
Point of maintenance
Maintenance work
Maintenance interval
Chain conveyor
Drive shaft
Bearings
Lubricating
Weekly (every 50 hours)
Drive chain
Chain tension
Drive chain, sprocket wheels
Checking
Re-adjusting, cleaning
Weekly (every 50 hours)
If necessary
Transport chain
Transporting chain
Sprocket wheels, skid rails
Chain tension
Checking
Cleaning
Re-adjusting
Weekly (every 50 hours)
Weekly (every 50 hours)
If necessary
Rocker limit switch
Function
Switch position
Setting
Checking
Checking
Re-adjusting
Weekly (every 50 hours)
Monthly (every 200 hours)
If necessary
Check condition of the transport chains
weekly (every 50 hours),
if case of any wear or
damages,
exchange immediately!
Clean the transport chains
weekly (every 50 hours).
Also clean the skid rails below the transport chains.
Rocker limit switch
Содержание UNIVERSAL 1000
Страница 19: ...Maintenance manual Universal 1000 P R O M E T A L 19 ...
Страница 25: ...Maintenance manual Universal 1000 P R O M E T A L 25 Hydraulic system ...
Страница 26: ...Maintenance manual Universal 1000 P R O M E T A L 26 ...
Страница 27: ...Maintenance manual Universal 1000 P R O M E T A L 27 Basic principles for the installation of hose assemblies ...
Страница 51: ...Maintenance manual Universal 1000 P R O M E T A L 51 This is followed with unscrewing all screws ...
Страница 52: ...Maintenance manual Universal 1000 P R O M E T A L 52 Now lower down tamper head and mould ...
Страница 53: ...Maintenance manual Universal 1000 P R O M E T A L 53 Pull out cart with mould on itself ...
Страница 58: ...Maintenance manual Universal 1000 P R O M E T A L 58 After adjustment is done ...
Страница 65: ...Maintenance manual Universal 1000 P R O M E T A L 65 Vibrator table maintenance ...