4. Commissioning and operation
4.1 Before mounting
Check whether a completely assembled measuring transducer has
been supplied. Inspect the device for any transport damage that
may have occurred. If such damage is present, notify the carrier and
supplier immediately. Keep the packaging, as it provides optimum
protection during tranport. Make sure that the housing and the
connection contacts are not damaged.
4.2 Mounting / Installation / configuration
• Due to the extremely low power consumption, the units can be mounted side by
side without an air gap between them even at an ambient temperature of 60°C.
• Configuration, monitoring, 2-point process calibration and more are performed
with either the UMU-FD detachable displays.
• All programming can be password protected.
Calibration and adjustment
During calibration and adjustment, the measurement and connection of external vol-
tages must be carried out in accordance with this manual, and the technician must
use tools and instruments that are safe for this purpose.
Normal operation
The operating personnel may only set or operate the device if these are permanently
installed in control panels or similar in a justifiable manner so that the operation does
not involve any danger to life or material. I.e., there must be no danger from contact
and the device must be placed so that it can be easily operated.