14
Promega Maxwell
®
CSC 48 Instrument | TM623 | Revised 6/20
Allow 10 minutes to unpack and set up the instrument. Choose a location with sufficient space
to be able to see the components and screen.
1. Cut off the straps from shipping box.
2. Cut the tape on the flaps of the box to open the shipping box.
3. Open the flaps and remove the accessories box from the packaging (Figure 5).
Figure 5. The accessories box.
4. Remove the four plastic clips from around the base of the shipping container. To do this,
pinch the inner plastic pieces of the clip and pivot the inner portion of the clip vertically; then
pull the entire plastic clip out from the base of the box. Slide the top portion of the shipping
box off the base. Remove the side foam pieces from the instrument. Carefully remove the
instrument from the box (Figure 6).
Figure 6. Remove the upper packing material.
5. Place the instrument on a flat stable surface. Leave at least 7.5 inches (19cm) of clearance
in front of the instrument to allow the instrument door to open without hindrance.
6. Remove the plastic bag from around the instrument.
Unpacking the
Maxwell
®
CSC 48 Instrument
3
Save the packaging
material in case the
instrument needs
to be returned for
service or repair.
Содержание AS8000
Страница 66: ...65 Promega Maxwell CSC 48 Instrument TM623 Revised 6 20 Notes Operating the Maxwell CSC 48 Instrument ...
Страница 70: ...69 Promega Maxwell CSC 48 Instrument TM623 Revised 6 20 Notes Cleaning and Maintenance ...
Страница 74: ...73 Promega Maxwell CSC 48 Instrument TM623 Revised 6 20 Notes ...
Страница 86: ...85 Promega Maxwell CSC 48 Instrument TM623 Revised 6 20 Notes ...