19
Chapter 9
INSTALLATION: DIffusion via HVAC System
Installation Kit for HVAC System Diffusion (included)
1. One (1) Prolitec injector tube for diffusion into HVAC system
2. Three (3) #10 self-tapping sheet-metal screws for mounting the injector tube in sheet metal
3. Three (3) feet of injector hose
4. Tubing Brace for preventing kinks in tight bends
1
2
3
4
HVAC Pre-installation Checklist
This checklist should be completed before the install date.
1. Confirm the area to be targeted for air treatment.
2. Determine the Air Handling Unit or duct that serves the target area.
3. Make sure the AHU does not use an open gas flame.
4. Find and mark the optimal insertion point for the Injector Tube. (See “Appliance Positioning”)
5. Find and mark the exact location for placement of the appliance. (See “Appliance Positioning”)
6. Note the distance between the insertion point and the proposed appliance location. (NEVER
MORE THAN 3 FEET and there should NEVER be a LOW POINT in the hose run.)
7. Determine and mark the location for the 110 or 220V AC power outlet (NEVER DIRECTLY
BELOW THE appliance).
9