Proceq 34310000 Скачать руководство пользователя страница 8

© 2017 Proceq SA 

15

14  

               © 2017 Proceq SA

‘R’ is automatically set as the unit for this method as no correla-
tion is made to UCS or E-modulus.

Perform the 1st impact.

Perform the 2nd impact on the same spot.

Terminate the series

The result is the difference between the two rebound values.

5.4  Delete the Last Impact (Outlier)

Obvious outliers may deleted if desired.

Impact number 8 is an outlier.

 
 
Delete

 
Confirm

 
The counter resets by one.

5.5  Working with the Review List

The last 20 series recorded can be reviewed in the data list. The memory is capable of storing many more 
series (See chapter 7). All series stored on the RockSchmidt can be downloaded to the PC for review.

Select review list.

 
Scroll in the list by ROLLING the hammer away from you or 
towards you. The arrow indicates the current series.

 
Select summary for details of the series.

Select to delete the series.

Select to return to the main menu.

6.  Ordering Information

Part No.

Description

343 10 000

RockSchmidt Type N including: battery charger with USB cable, data carrier with 
software, carrying strap, grinding stone, documentation and carrying bag

343 20 000

RockSchmidt Type L including: battery charger with USB cable, data carrier with 
software, carrying strap, grinding stone, documentation and carrying bag

 

Parts and Accessories

341 10 113

Cover for USB port 

343 10 310

Plunger RockSchmidt complete (with plunger spring)

341 10 400

Anvil

310 99 037

Grinding stone 

341 80 105

Carrying bag complete

351 90 018

USB cable 1.8 m 

341 80 112

USB charger, global 

341 80 203

Carrying strap

Содержание 34310000

Страница 1: ...Made in Switzerland ROCK SCHMIDT OPERATING INSTRUCTIONS...

Страница 2: ...terface 8 2 5 Sample Preparation 9 2 6 Correct use of the Hammer 9 3 Optional Settings 10 3 1 Units 10 3 2 Statistics 10 3 3 Conversion Curve 11 3 4 Correction Factor 11 3 5 Checking the Current Setti...

Страница 3: ...ration and maintenance of the instrument and its components Unauthorized structural modifications to the instrument and its components Serious damage resulting from the effects of foreign bodies accid...

Страница 4: ...hut down automatically after 5 minutes of inactivity Standards and guidelines applied The following standards and guidelines have been applied in RockSchmidt for the procedure to determine the rebound...

Страница 5: ...en holder to prevent damage to the cores on impact Ideally it should have a semi circular groove with the same diameter as the core but it may also be a V shaped groove Please refer to the guidelines...

Страница 6: ...nd the range Once downloaded to a PC RockLink also calculates the median and the mode If a conversion curve has been selected tilting the instrument shows the UCS in the chosen unit Tilting again disp...

Страница 7: ...are not saved Select single shot mode Confirm or cancel the action 5 2 Measurement Series The number of impacts required for a valid rebound number depends on the statistics method selected Having sel...

Страница 8: ...lect review list Scroll in the list by ROLLING the hammer away from you or towards you The arrow indicates the current series Select summary for details of the series Select to delete the series Selec...

Страница 9: ...over time The RockSchmidt checks for correct impact energy with each and every impact see above Nevertheless it is recommended to check the calibration on a regular basis Set the hammer to single shot...

Страница 10: ...ton to establish the connection 9 1 Viewing the Data The data stored on your RockSchmidt will be displayed on the screen The test series is identified by the Impact counter value There is a Name colum...

Страница 11: ...exported in the format defined by the active Tab i e either in series or summary format To open the file in Excel locate the file right click on it and Open with Microsoft Excel The data will be opene...

Страница 12: ...eters and the hammer type RockSchmidt N for which it is applicable NOTE The curve may be exponential or a first second or third order polynomial ISRM recommend the use of exponential curves for UCS an...

Страница 13: ...07 info asia proceq com Proceq Rus LLC Ul Optikov 4 Korp 2 lit A Office 410 197374 St Petersburg Russia Phone Fax 7 812 448 3500 info russia proceq com Proceq Middle East P O Box 8365 SAIF Zone Sharja...

Отзывы: