
50
Figure 16. Tap bolts into place
13.
Insert a 5/8 x 3-1/8 inch cold rolled dowel pin (PN MX03261) into the hole closest to the bottom bearing. Weld
the dowel to the auger tube.
Note: Only weld on one end of the dowel pin and only on the side of the pin farthest from the bottom bearing. Welding
both ends of the pin or completely around the end of the pin will make it difficult to extract the pin in future service
intervals.
Figure 17. Weld pin closest to the bottom bearing
6.3 BOTTOM BEARING INSTALLATION
1.
Place a bead of silicone in one continuous ring around the center of both sides of the auger seal (PN AGSL005)
and slide over the idler shaft (PN REJ314) on the outside of the mix auger frame.
Содержание P Series
Страница 1: ...1 PROALL Mobile Mixer Service Manual P Model MX04703 August 2020 Rev 1 0 ...
Страница 2: ...2 5810 47 Avenue Olds Alberta Canada T4H 1V1 E info proallinc com P 403 335 9500 F 403 335 9560 ...
Страница 20: ...20 has been removed and not replaced then the charge pressure will drop to zero C ...
Страница 85: ...International Manufacturing Inc P P1 OUT IN OUT IN 2 1 3 IN S1 S2 2 1 3 OUT IN ...
Страница 100: ... ADMIX 1 ADMIX 2 WORK LIGHTS ...
Страница 101: ... COOLER 1 VIB1 SPARE VIB1A SPARE VIB2A VIB2 VIB3 VIB4 VIB5 ...
Страница 105: ... BATTERY V BATTERY V ...