background image

Primer

a Limited, Unit 8 Bankfield House, 250 Bristol 

Av

enue, Blackpool, FY2 0JF

t

  

0330 058 0988

   

e

  

[email protected]

  

 www

.safehingeprimera.com

Important Note:  products are protected by Intellectual Property Rights including UK and Community Unregistered Design Rights,  UK and Community Registered Designs and UK Patents and Patent Applications. 

For further details please contact Safehinge Primera Limited.

Note:

 Unless ordered separatley the 

cylinder is not included in this kit.

 

Description

Roller Bolt Deadlock 103x235
Spindle Universal 44mm-63mm & O-ring 
Turn/Pull complete
 732H Pull Handle on invisable Backplate
 Twin-Tech Escutcheon plate assembly
Spring
Indicator disc
Fixings Supplied                                                                                                                                  

 70

PR6130RBD

Roller Bolt

Dead lock 

M5 Bolt

from the

other side

of the door

To adjust Roller Catch projection 

turn screw anti-clockwise to

increase or clockwise to withdraw.

(Max adjustment 6.5mm-13mm)

PR4-732H

Suregrip

Handle

Spring rests against lockcase

 45mm   

Emergency 

Tool

Access

Adjusting Roller Catch

Note: 
1:  If, when fitting the pull handle, the screws make direct contact with the lock-case, please use the shorter (5/8“) screws    
 

included in the fixing pack.

2:  Standard Primera Products are designed for internal applications only. For external applications products plated to    

 

 

“Service Condition 5” should be used.

3:  Only use the anti-tamper screws provided.
4:  We strongly recommend that impact drivers are not used to install this product.

3S- 

56

 -732H (TWIN-TECH)

Indicator Lockset

a

c

b

1

B

A

D1

D2

E

C

X

Y

Z

Z

2

3

4

e

e

B ro

k e n K

ey

!

B ro

k e n K

ey

!

d

PR3S Secondary Barricade Instructions

5.1

 This lockset is equipped with an important secondary barricade override mechanism the installation of which is vital to the safety 

features of this product. Carefully review diagrams 1-4 below.

5.2

 To install this product correctly the spindle must be accessible when the access slider (b) is opened by removing the button head 

anti-tamper screw  (See diagrams 1 & 2)

5.3

 Using the centre of the spindle as a datum (and preferable using a Forstner bit) cut a 45mm dia. hole to create access for the T-Bar 

Emergency Tool. 

5.4

 It is essential to ensure that the T-Bar Spindle Key will fit properly to operate the lock in an emergency. This should be verified at the 

point of installation using the tools illustrated below.

UNDER NO CIRCUMSTANCES SHOULD THIS PRODUCT BE FITTED WITHOUT ACCESS TO THESE TOOLS.  

5.5

 Please refer back to page 2 section 6 to complete this installation.

Note: 

The cylinder cut out is made on the external side of the door only and must not go right through the door.

Installing the Twin-Tech pattress and setting the emergency slide cover handing.

1

(Fig 1)

(Fig 4)

(Fig 3)

(Fig 2)

1. 

Carefully remove the handing label and the bag containing the hex grub screw and set aside. Take care not to lose the hex grub screw as this is critical 

to a successful installation. 

2.

 Remove the M4 x 6mm button head screw marked Z and slide the emergency cover out of the of the pattress as shown at A.

3.

 Secure the pattress to the door as illustrated at B.

4.

 With the pattress installed, slide the emergency cover back into the pattress taking note of the two tapped holes marked X and Y as detailed at    

  drawing C.

5. 

Identify the handing of the door according to the detail shown at D1/D2.

6. 

For figure 1/4 applications align the centre hole in the emergency slide cover with hole Y.

 

  For figure 2/3 applications align the centre hole in the emergency slide cover with hole X.

7. 

Using a 2mm allen key,

 

insert the hex grub screw through the centre hole in the slide plate and in to either hole (X or Y) and fully tighten. The top of    

  the grub screw will sit below the surface when tightened. The grub screw limits the movement of the slide plate and prevents it from coming out in use.

 

8. 

To complete the installation of the Twin-Tech pattress, secure the slide plate back in position using the M4 x 6mm button head screw marked Z as    

  shown at E. The slide plate must move freely and without the spindle interfering with the movement.

 

 

IMPORTANT NOTE:

 The end of 

the spindle should be no more 

than 1mm behind the surface of 

the Twin-Tech Pattress

 

A: This Turn/Pull is equipped with a screw to adjust the projection of the 
spindle if required (most likely if the spindle is cut too short in error) see 
drawing A
B:  When cutting the spindle to the required length, please make sure that 
the material is cut from the end marked B as illustrated. The 3 slots at 
the opposite end of the spindle C are an important safety feature and 
designed to sheer at 50NM to protect the lock and ensure clinical staff 
maintain control of the lock at all times. The O-ring in the first slot will 
also assist in the retention of the spindle in the nozzle of the Turn/Pull 
during normal use.

 

There must be at least I sheer point 

between the end of the Turn/Pull nozzle 

& the lockcase. 

Important Spindle & Turn/Pull Information

Sheer Points

 

Do Not Cut Here 

O-Ring

Lockcase

Lockcase

Door

        

A

B

C

Adjust the spindle projection screw

by inserting screwdriver through

the door/lockcase.

The spindle must

engage in the socket

by at least 7mm

Adjust length of spindle by cutting with a 

hacksaw at this end. It is important that 

the end of the spindle is cut square. 

All rights reserved © 2013 Primera Ltd

Отзывы: