Helios Large Display Analog Input Batch Controller Instruction Manual
PD2-6210
22
Basic Operation and Programming
The meter is factory calibrated prior to shipment to read
in milliamps and volts depending on the input selection.
The calibration equipment is certified to NIST standards.
Overview
There are no jumpers to set for the meter input selection.
Setup and programming are done through the programming buttons located under the front door panel.
After power and input signal connections have been completed and verified, apply power to the meter.
www.calcert.com
1.888.610.7664
0
5
10
15
20
25
30