MRAC STEEL ROOF 

INSTALLATION GUIDE

L FEET HOOK

E N E R G Y

Содержание MRac L Feet

Страница 1: ...MRAC STEEL ROOF INSTALLATION GUIDE L FEET HOOK E N E R G Y...

Страница 2: ...E N E R G Y INSTALLATION MANUAL Product Introduction 01 Product Introduction 02 Installation Tools 03 Components 03 Solution Overview 04 Installation Guide 05 Warranty 12 Contents...

Страница 3: ...lation guide through contacting Powerwave Energy by email Complying with all applicable local or national building codes including any that may supersede this manual Ensuring that MRac and other produ...

Страница 4: ...Tools Components 03 6mm Inner hexagon spanner 0 8mm adjustable wrench electrical tools 5m tape measure Infrared calibrator 2 Installation Tools 3 Components MA End Clamp Kit L Feet Waterproof Plate M...

Страница 5: ...E N E R G Y INSTALLATION MANUAL Solution Overview 04 1 MA Rail 2 MA End Clamp Kit 3 L Feet 4 Splice for MA Rail 5 MA Inter Clamp Kit 6 Waterproof Plate 4 Solution Overview 4 1 Components 1 2 5 3 4 6...

Страница 6: ...not pass through the bottom of the MA Clamp 5 Installation Guide 5 1 Installation of Clamp Kit At this point the bolt can still slide freely in the rail slide the bolt to the position where the Inter...

Страница 7: ...Installation of L Feet 5 2 1 According to the plan size of the drawing install the L Feet on the metal roof and pre lock it as shown in the figure 5 3 1 According to the plan if the rail is not long...

Страница 8: ...d the anodized film of the corrugated surface of rail splice can be pierced so that the two bolts are conducted through the corrugated sheet Installation Guide 09 5 Installation Guide 5 3 Installation...

Страница 9: ...il connectors are on the same side as shown on the right Recommended torque 8 N m The rail connectors are on the same side 5 3 4 Install the planned location according to the engineering plan and inst...

Страница 10: ...the solar panel assembly and then tightly lock the bolt recommended torque 8N m 5 4 2 Put the pre installed Inter Clamp Kit from the top and bottom into the rails and firmly attach the solar panel ass...

Страница 11: ...viously installed solar panel assembly and lock the inter clamp assembly recommended torque 8 N m Installation Guide 10 5 Installation Guide 5 4 Install the panels Please note that the anti skid prote...

Страница 12: ...t the inter clamp with grounding clip on the rail and the four corners of the grounding clip will stick closely to rail pic 2 The next step is to put the panels on the top of grounding clip strap pic...

Страница 13: ...and the larger part of the slot is used for to hold 2 pieces of DC cables Installation Guide 12 5 Installation Guide 5 3 Installation of Solar Panels Pic 2 Pic 1 Pic 3 Then install two sets of groundi...

Страница 14: ...ising out of the use of the Product by Purchaser under any circumstances If within the specified Warranty periods the Product shall be reasonably proven to be defective then Powerwave Energy shall rep...