PowerPlus Energy Powerlink Скачать руководство пользователя страница 1

 

 

 

Installation and Operation 

Manual 

Powerlink Installation and Operation Manual

V 3.3

05/12/2022  Page   of 

1

8

Powerlink 

+61 3 8797 5557 | [email protected]

powerplus-energy.com.au

Residential

Commercial

Industrial

Utilities and
Telecom

Содержание Powerlink

Страница 1: ...eration Manual Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 1 8 Powerlink 61 3 8797 5557 info powerplus energy com au powerplus energy com au Residential Commercial Industrial Utilities and Telecom ...

Страница 2: ...upplied with Powerlink 5 Powerlink module Setup and monitoring procedure 6 Powerlink set up 6 Web interface setup 6 Battery scanning procedure 6 Cabling 7 Request login details for the portal 8 Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 2 8 ...

Страница 3: ...batteries have been designed as a stand alone self managed solution however the PowerLink module also provides information via MODBUS with future releases including CANBUS and SNMP options The information provided by the PowerLink module will assist in providing the optimum performance and longevity from your energy storage Speci fi cations Powerlink Installation and Operation Manual V 3 3 05 12 2...

Страница 4: ...tallation and Operation Manual V 3 3 05 12 2022 Page of 4 8 40 mm 110 mm 110 mm LAN port USB ports Micro USB Power Port name Port description Audio port unused HDMI port unused RJ45 monitoring port LED indicators LAN port LED indicators ...

Страница 5: ...Supplied with Powerlink Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 5 8 2m RJ45 cable 30cm RJ45 cable 5V power supply to micro USB RJ45 termination plug ...

Страница 6: ...ill open the home page as shown in the picture Press con fi guration button a screen like the picture will open Press reset data to remove any previous data from the Files enter the Number of Batteries to be scanned into the box and press submit Battery scanning procedure Note battery scanning order should be from top to bottom in the rack with only one battery connected at at time Take the longes...

Страница 7: ...ry Connect the other end into next battery Daisy chain Repeat the daisy chain connection till last battery Connect the RJ45 termination connector in the remaining slot on the last battery 19 After 1 2 minutes go to MultiStat available on the home page 20 Verify that all the batteries are responding If you are not able to see the battery status in MultiStat window press Restart polling button in co...

Страница 8: ... performance powerplus energy com au 3000 login Customer needs to supply all PowerLink Serial Numbers and Site Name Support will create login and will email details to the customer once complete Powerlink Installation and Operation Manual V 3 3 05 12 2022 Page of 8 8 61 3 8797 5557 2 Koornang Road Scoresby VIC 3179 PO Box 4407 Knox City Vic 3152 info powerplus energy com au ...

Отзывы: