73
Maintenance and Service
5.3
Maintenance schedule
5.3.1 PowerBoss system mainte-
nance, customer
The following maintenance work must
be completed by the customer at the in-
tervals stipulated.
It relates to the daily and weekly main-
tenance work.
Activity
Interval
Daily
Directly prior to starting operation:
Fill the fresh water tank (dose the cleaning agent, fill fresh water)
o
Before or after operation:
Check the properties of the deflectors to the right and left and repair them or replace the deflector rub-
ber (left and right) as necessary
o
Check the service brake in terms of its functionality and for signs of leaks; repair as necessary
o
Check the parking brake in terms of its functionality and for signs of leaks; repair as necessary
o
Check the squeegee is clean and for signs of damage; pay special attention that the support rollers run
smoothly and for foreign bodies, clear as necessary
o