73
Englis
h
8.3 Understanding the generator start up process
1
The generator's start up begins a few seconds after outage.
2
The system sends a signal to the choke to work automatically.
3
The system sends power to the start motor to start up the engine. The
maximum working time of the start motor is about 2 seconds to prevent
overheating.
3.1
If the generator does not start in a first attempt new attempts will be performed
to a maximum of 6. In each and every one the system automatically varies the
choke opening in search of the most favorable option for starting up.
4
After the generator start up does not offered power immediately. The generator
will begin delivering after 20 seconds from the start up in order to ensure that the
engine is started without connected loads.
NOTE: Under conditions of extreme cold (below 5º C) the engine will have much
greater difficulty in starting so 6 start attempts may be insufficient. In this case the
presence of a person to start manually with a key would be necessary. We
recommend installing the group protected from intense cold to avoid start up
failures due to temperature.
NOTE:
GENERGY is not liable under any circumstances for damages to
products or equipment that may arise from the lack of supply due to a
malfunctioning generator.
DANGER: This equipment is not designed to protect vital equipment
such as medical assistance equipment, extreme safety equipment or any
other equipment that pose a risk to persons or property in case of lack of
supply.
Содержание GUARDIAN S6-ATS
Страница 2: ......
Страница 8: ...6 Español FILTRO DE AIRE ESTRANGULADOR VALVULA GASOLINA BATERIA ...
Страница 52: ......
Страница 58: ...55 English AIR FILTER CHOKE GASOLINE VALVE BATTERY ...
Страница 102: ......
Страница 108: ...104 Português FILTRO DE AR ESTRANGULADOR VÁLVULA GASOLINA BATERIA ...
Страница 153: ......
Страница 154: ...51 POLIGONO INDUSTRIAL NEINVER CALAHORRA LA RIOJA CONTACTO INFORMAÇÕES INFO SG GROUP ES ...