(874) EInsAtZ 9900-GB
GB
OPEraTiOn
On-road transport position
LION 4000:
see page 1.
LION 000:
Raise side pieces so that implement’s total
length is under 3 m.
Lightning during use on roads
If desired, a lightning unit can be supplied.
For single parts see spare parts list.
Check before putting into operation
- Implement connected horizontally.
- Upper link correctly positioned.
- Lower link () laterally secured.
- Drive shaft adapted to correct length.
- Rotary r.p.m. pre-selected per table.
Safety point
Danger - stay clear of
rotating machine parts.
Observe safety distance
when engine is running
with p.t.o. connected.
Power-take-off r.p.m. 1000 min
-1
This r.p.m. is preferable so that various drive components on the
tractor and implement are not subject to additional
load.
Power-take-off r.p.m. 540 min
-1
/ 750 min
-1
This r.p.m. should only be used when working on
light ground and with tractor’s with less than 90
hp (kW).
Changing the gear wheels
- Tilt implement forward in order prevent gear oil from running
out.
- Remove gear housing cover ().
- Slip gear wheels (Z1 and Z2) on in accordance with table.
- Refit gear housing cover (7).