background image

9900 LEGENDE-SCHMIERPL / BA/EL ALLG / BETRIEBSSTOFFVORSCHRIFT

- 2 -

Smøreplan  

 

8

h

   Hver 8. driftstime

 

20

h

   Hver 20. driftstime

  40 F   Hvert 40. læs
  80 F   Hvert 80. læs
 

1 J 

1 gang årligt

 100 ha 

For hver 100 hektar

  FETT   Fedt
 

=      Antal smørenipler

 

(IV)   Se smørediagrammet

 

Liter   Liter

 

*   Udstyrsvariant

 

 

Se producentens anvisninger

Schmierplan

 

8

h

   alle 8 Betriebsstunden

 

20

h

   alle 20 Betriebsstunden

  40 F   alle 40 Fuhren
  80 F   alle 80 Fuhren
 

1 J  1 x  jährlich

 100 ha  alle 100 Hektar
  FETT   FETT
 

 =    Anzahl der Schmiernippel

 

(IV)   Siehe Anhang "Betriebsstoffe"

 

Liter   Liter

 

*   Variante

 

  Siehe Anleitung des Herstellers

Smeerschema  

 

8

h

   alle 8 bedrijfsuren

 

20

h

   alle 20 bedrijfsuren

  40 F   alle 40 wagenladingen
  80 F   alle 80 wagenladingen
 

1 J  1 x  jaarlijks

 100 ha  alle 100 hectaren
  FETT   VET
 

 =    Aantal smeernippels

 

(IV)   Zie aanhangsel "Smeermiddelen"

  Liter   Liter
 

*   Varianten

 

  zie gebruiksaanwijzing van de fabrikant

Schema di lubrificazione   

 

8

h

   ogni 8 ore di esercizio

 

20

h

   ogni 20 ore di esercizio

  40 F   ogni 40 viaggi
  80 F   ogni 80 viaggi
 

1 J   volta all'anno

 100 ha   ogni 100 ettari
  FETT   GRASSO
 

 =    Numero degli ingrassatori

 

(IV)   vedi capitolo “materiali di esercizio”

  Liter   litri
 

*   variante

 

  vedi istruzioni del fabbricante

Plan de graissage  

 

8

h

   Toutes les 8 heures de service

 

20

h

   Toutes les 20 heures de service

  40 F   Tous les 40 voyages
  80 F   Tous les 80 voyages
 

1 J  1 fois par an

 100 ha  tous les 100 hectares
  FETT   GRAISSE
 

 =    Nombre de graisseurs

 

(IV)   Voir annexe "Lubrifiants"

  Liter   Litre
 

*   Variante

 

  Voir le guide du constructeur

Lubrication chart

 

8

h

   after every 8 hours operation

 

20

h

   after every 20 hours operation

  40 F   all 40 loads
  80 F   all 80 loads
 

1 J  once a year

 100 ha  every 100 hectares
  FETT   GREASE
 

 =    Number of grease nipples

 

(IV)   see supplement "Lubrificants"

  Liter   Litre
 

*   Variation

 

  See manufacturer’s instructions

FETT

Esquema de lubricación

 

8

h

   Cada 8 horas de servicio

 

20

h

   Cada 20 horas de servicio

  40 F   Cada 40 viajes
  80 F   Cada 80 viajes
 

1 J   1 vez al año

 100 ha  Cada 100 hectáreas
  FETT   LUBRICANTE
 

 =    Número de boquillas de engrase

 

(IV)   Véase anexo “Lubrificantes”

 

Liter   Litros

 

*   Variante

 

  Véanse instrucciones del fabricante

Plano de lubrificação  

 

8

h

   Em cada 8 horas de serviço

 

20

h

   Em cada 20 horas de serviço

  40 F   Em cada 40 transportes
  80 F   Em cada 80 transportes
 

1 J  1x por ano

 100 ha  Em cada100 hectares
  FETT   Lubrificante
 

 =    Número dos bocais de lubrificação

 

(IV)   Ver anexo ”Lubrificantes"

 

Liter   Litro

 

*   Variante

 

  Ver instruções do fabricante

Smörjschema  

 

8

h

   Varje 8:e driftstimme

 

20

h

   Varje 20:e driftstimme

  40 F   Varje 40: e lass
  80 F   Varje 80: e lass
 

1 J  1 x  årligen

 100 ha  Varje 100:e ha
  FETT   FETT
 

 =    Antal smörjnipplar

 

(IV)   Se avsnitt ”Drivmedel”

 

Liter   liter

 

*   Utrustningsvariant

 

  Se tillverkarens anvisningar

Smøreplan  

 

8

h

   Hver 8. arbeidstime

 

20

h

   Hver 20. arbeidstime

  40 F   Hvert 40. lass
  80 F   Hvert 80. lass
 

1 J  1 x  årlig

 100 ha  Totalt 100 Hektar
  FETT   FETT
 

 =    Antall  smørenipler

 

(IV)   Se vedlegg "Betriebsstoffe"

 

Liter   Liter

 

*   Unntak

 

  Se instruksjon fra produsent

Voitelukaavio  

 

8

h

   8 käyttötunnin välein

 

20

h

   20 käyttötunnin välein

  40 F   40 kuorman välein
  80 F   80 kuorman välein
 

1 J  kerran vuodessa

 100 ha  100 ha:n välein
  FETT   RASVA
 

 =    Voitelunippojen lukumäärä

 

(IV)   Katso liite ”Polttoaineet”

 

Liter   Litraa

 

*   Versio

 

  Katso valmistajan ohjeet

DK

FIN

I

P

NL

S

N

D

GB

F

E

Содержание HIT 470 N

Страница 1: ...h Nr Fgst Ident Nr 3425 4 3 2 02 5 4 6 29 0AGE 4RANSLATION OF THE ORIGINAL PERATING ANUAL Ihre Your Votre Masch Nr Fgst Ident Nr R Tedder 99 2041 GB 80I 0 HIT 470 N Type ZK 2041 01001 HIT 470 H Type Z...

Страница 2: ...damage is damage caused by a machine and not to it An excess of Euro 500 is provided for such a liabilioty In accordance with the laws of product liability entrepreneurial property damages are exclude...

Страница 3: ...s checked re tightness Drive shaft cut to correct lenght Correct power take off speed indicated Fitting to tractor carried out to three point linkage Trial run carried out and no defects found Functio...

Страница 4: ...lectrical cables 5 Lowering the rotary tedder 6 Parking in the open 6 Winter storage 6 Lowering the machine Danger of tipping 7 ADJUSTMENTS BEFORE OPERATION Adjustment of rotor inclination 8 Tine adju...

Страница 5: ...A1 points 7 8a 8h Pinning the machine to the three point linkage Fix the hydraulic lower link 4 in such a way that the machine cannot swing out sideways Push in the support foot 5 and secure Drive sh...

Страница 6: ...agedwhengaraging the implement Lowering the rotary tedder Always park implement stabily secure against rolling and tipping over The implement can be parked while in the transport or working position S...

Страница 7: ...danger of tipping Then uncouple the implement from the tractor Note When in operation the support stand must be placed in the upper position and secured with pin V Lowering the machine Danger of tipp...

Страница 8: ...er Transport position Total implement width in the working position more than 3 m Total implement widht in the transport position see Techn Data Always swing the outer rotors in before transporting On...

Страница 9: ...tention Check whether the lockinghooks 10 are locked into position correctly Using the tractor s lifting gear lower the implement far enough so that it stands on the ground on both centre running whee...

Страница 10: ...hine with three point slewing headstock type N If the implement is being raised by the lifting gear whilst travelling in a curve the implement swings automatically into the central position Ifworkingo...

Страница 11: ...ing of a single runner wheel Pressuptheadjusting lever 7 Swingthewheelstotheright or to the left Lock the adjusting lever into the desired position Note In this working position the swivel area 9 is u...

Страница 12: ...use high pressure washers for the cleaning of bearing and hydraulic parts Danger of rust After cleaning grease the machine according to the lubrication chart and carry out a short test run Cleaning w...

Страница 13: ...schedule Grease the lubrication nipples with universal grease after every 20 hours of operation Before leaving the machine over winter oil all the joints well and grease all bearings Intake transmissi...

Страница 14: ...min 80 bar pressure max 180 bar 7 pole electric connection for lighting 12 Volt Description HIT 470 N H model ZK 2041 HIT 540 N model ZK 2051 Width of appliance in working position m 4 70 5 40 Workin...

Страница 15: ...ion spring Standard at HIT 40 10 Gearbox Ihre Your Votre Masch Nr Fgst Ident Nr Position of Vehicle Identification Plate The factory number is imprinted on the accompanying Vehicle Identification Plat...

Страница 16: ...GB Anhang Titelblatt _BA Allgemein GB Supplement...

Страница 17: ...heap buy can sometimes be very expensive Be sure you purchase the Original with the cloverleaf sym bol Quality and precise fitting Operating safety Reliable operation Longer lasting Economy Guaranteed...

Страница 18: ...bited a The transport of persons on the machine is not permitted b The machine may only be driven on public roads when in the position stipulated for road transport 7 Driving ability with auxiliary eq...

Страница 19: ...on use clean and lubricate driveshaft For winter working grease the tube guards to avoid them freezing together Matching driveshaft to tractor To determine the actual length required hold the two halv...

Страница 20: ...o protect the implement against damage Driving the right way will avoid triggering the clutch too often and thus causing unnecessary wear on it and the implement Lubricating interval 500 hrs Special l...

Страница 21: ...plug let run out and duly dispose waste oil Before garaging winter season an oil change and greasing of all lubricating points has to be done Unprotected blanc metal parts outside joints etc have to...

Страница 22: ...UNIFARM 15W 30 GEAROIL GP 80W 90 GEAROIL GP 85W 140 MULTI PURPOSE GREASE H FIBRAX EP 370 NEBULA EP 1 GP GREASE GEAR OIL GX 80W 90 GEAR OIL GX 85W 140 ULTRAMAX HLP 32 46 68 SUPER TRAC FE 10W 30 ULTRAM...

Страница 23: ...fter every 8 hours operation 20h after every 20 hours operation 40 F all 40 loads 80 F all 80 loads 1 J once a year 100 ha every 100 hectares FETT GREASE Number of grease nipples IV see supplement Lub...

Страница 24: ...24 0000 schmierplan 212 2 9400 schmierplAn 212 2 1 1 Variante Variante 3 3 3 3 3 2 4 HD SAE 90 0 5Liter h 1J 20 h 20...

Страница 25: ...Stummel A Achtung Verwenden Sie Shell Spezial Getriebefett H 0 12 kg Montage du r ducteur pour andain D monter le prodecteur du bo tier renvoi d angle 10 Enfiler le r ducteur 11 sur le bo tier 10 et...

Страница 26: ...t mounted implement front ballast distance from centre of gravity for combinedfrontmountedimplement front ballast to front axle centre Tractor wheelbase distance from rear axle centre to centre of low...

Страница 27: ...he rear Record the calculated real and the permissible total weight given in the instruction handbook for the tractor into the table 5 CALCULATION OF THE REAL REAR AXLE LOAD TH tat Record the calculat...

Страница 28: ...to the basic safety and health requirements of EEC Directions 98 37 if applicable and to the other relevant EEC Directions __________________________________________________________________________ t...

Страница 29: ...randeringen van reeds geieverde machines kan worden afgeleid Technische gegevens maten en gewichten zijn niet bindend Vergissingen voorbehouden Nadruk of vertaling ook gedeeltelijk slechts met schrift...

Страница 30: ...s P ttinger Maschinenfabrik Gesellschaft m b H A 4710 Grieskirchen Telefon 0043 0 72 48 600 0 Telefax 0043 0 72 48 600 511 e Mail landtechnik poettinger co at Internet http www poettinger co at Gebr P...

Отзывы: