- 28 -
0701_GB-Power-control_5543
GB
PoWer conTrol - oPeraTion
Control panel
Button indication
Display indicator:
- WORK functions
- DATA functions
- SET functions
- DIAG functions
- TEST
- CONFIG
Buttons for loading functions:
1 - Automatic-loader
2 - Scraper floor back run / Unload
- Swing cutting unit in
4 - Swing cutting unit out
5 - Raising pivoting drawbar – wagon lowers
6 - Lowering pivoting drawbar – wagon raises
7 - Raising pick-up
8 - Lowering pick-up
Buttons for unloading functions:
9 - Automatic unloading
10 - Scraper floor back run /
Optional 2 phase motor slow - fast
11 - STOP
12 - Regulating rollers On-Off
1 - Preselect cross conveyor belt /
Stop cross conveyor belt
14 - Cross conveyor belt movement left /
decrease scraper floor speed
15 - Scraper floor forward run
16 - Tracking front axle On-Off
17 - Cross conveyor belt movement right /
increase scraper floor speed
18 - Open tailgate
19 - Close tailgate
20 - On-Off / Menu change
Safety tips!
Please take
particular
care when
the operating
elements on
the trailer and
the tractor
are to be used
simultaneously
by more than
one person. A
conscientious
arrangement
should be
made by those
concerned before
operation.
An example:
Danger of injury
arises if a person
stands at the
rear of the trailer
and somebody
in the tractor
cabin activates
a switching
function.
Configuration
In order to ensure the correct power control function, the following connections must be checked:
1. 12 V power supply from tractor
2. Connection: Operating device to tractor cable (ISO)
. Connection: Tractor cable to job calculator on the machine
The software version of the operating device (V x.xx) is
shown after the operating device has been successfully
supplied with power and switched on.
1
2
4
6
8
3
5
7
9
12
15
18
10
13
16
19
11
14
17
20