background image

9900 LEGENDE-SCHMIERPL / BA/EL ALLG / BETRIEBSSTOFFVORSCHRIFT

- 4 -

Smøreplan  

 

8

h

   Hver 8. driftstime

 

20

h

   Hver 20. driftstime

  40 F

   Hvert 40. læs

  80 F

   Hvert 80. læs

 

1 J

 

1 gang årligt

 100 ha

 

For hver 100 hektar

  FETT

   Fedt

 

=      Antal smørenipler

 

(IV)

   Se smørediagrammet

 

Liter

   Liter

 

*   Udstyrsvariant

 

 

Se producentens anvisninger

Schmierplan

 

8

h

   alle 8 Betriebsstunden

 

20

h

   alle 20 Betriebsstunden

  40 F

   alle 40 Fuhren

  80 F

   alle 80 Fuhren

 

1 J

  1 x  jährlich

 100 ha

  alle 100 Hektar

  FETT

   FETT

 

 =    Anzahl der Schmiernippel

 

(IV)

   Siehe Anhang "Betriebsstoffe"

 

Liter

   Liter

 

*   Variante

 

  Siehe Anleitung des Herstellers

Smeerschema  

 

8

h

   alle 8 bedrijfsuren

 

20

h

   alle 20 bedrijfsuren

  40 F

   alle 40 wagenladingen

  80 F

   alle 80 wagenladingen

 

1 J

  1 x  jaarlijks

 100 ha

  alle 100 hectaren

  FETT

   VET

 

 =    Aantal smeernippels

 

(IV)

   Zie aanhangsel "Smeermiddelen"

  Liter

   Liter

 

*   Varianten

 

  zie gebruiksaanwijzing van de fabrikant

Schema di lubrificazione   

 

8

h

   ogni 8 ore di esercizio

 

20

h

   ogni 20 ore di esercizio

  40 F

   ogni 40 viaggi

  80 F

   ogni 80 viaggi

 

1 J

   volta all'anno

 100 ha

   ogni 100 ettari

  FETT

   GRASSO

 

 =    Numero degli ingrassatori

 

(IV)

   vedi capitolo “materiali di esercizio”

  Liter

   litri

 

*   variante

 

  vedi istruzioni del fabbricante

Plan de graissage  

 

8

h

   Toutes les 8 heures de service

 

20

h

   Toutes les 20 heures de service

  40 F

   Tous les 40 voyages

  80 F

   Tous les 80 voyages

 

1 J

  1 fois par an

 100 ha

  tous les 100 hectares

  FETT

   GRAISSE

 

 =    Nombre de graisseurs

 

(IV)

   Voir annexe "Lubrifiants"

  Liter

   Litre

 

*   Variante

 

  Voir le guide du constructeur

Lubrication chart

 

8

h

   after every 8 hours operation

 

20

h

   after every 20 hours operation

  40 F

   all 40 loads

  80 F

   all 80 loads

 

1 J

  once a year

 100 ha

  every 100 hectares

  FETT

   GREASE

 

 =    Number of grease nipples

 

(IV)

   see supplement "Lubrificants"

  Liter

   Litre

 

*   Variation

 

  See manufacturer’s instructions

FETT

Esquema de lubricación

 

8

h

   Cada 8 horas de servicio

 

20

h

   Cada 20 horas de servicio

  40 F

   Cada 40 viajes

  80 F

   Cada 80 viajes

 

1 J

 

 

1 vez al año

 100 ha

  Cada 100 hectáreas

  FETT

   LUBRICANTE

 

 =    Número de boquillas de engrase

 

(IV)

   Véase anexo “Lubrificantes”

 

Liter

   Litros

 

*   Variante

 

  Véanse instrucciones del fabricante

Plano de lubrificação  

 

8

h

   Em cada 8 horas de serviço

 

20

h

   Em cada 20 horas de serviço

  40 F

   Em cada 40 transportes

  80 F

   Em cada 80 transportes

 

1 J

  1x por ano

 100 ha

  Em cada100 hectares

  FETT

   Lubrificante

 

 =    Número dos bocais de lubrificação

 

(IV)

   Ver anexo ”Lubrificantes"

 

Liter

   Litro

 

*   Variante

 

  Ver instruções do fabricante

Smörjschema  

 

8

h

   Varje 8:e driftstimme

 

20

h

   Varje 20:e driftstimme

  40 F

   Varje 40: e lass

  80 F

   Varje 80: e lass

 

1 J

  1 x  årligen

 100 ha

  Varje 100:e ha

  FETT

   FETT

 

 =    Antal smörjnipplar

 

(IV)

   Se avsnitt ”Drivmedel”

 

Liter

   liter

 

*   Utrustningsvariant

 

  Se tillverkarens anvisningar

Smøreplan  

 

8

h

   Hver 8. arbeidstime

 

20

h

   Hver 20. arbeidstime

  40 F

   Hvert 40. lass

  80 F

   Hvert 80. lass

 

1 J

  1 x  årlig

 100 ha

  Totalt 100 Hektar

  FETT

   FETT

 

 =    Antall  smørenipler

 

(IV)

   Se vedlegg "Betriebsstoffe"

 

Liter

   Liter

 

*   Unntak

 

  Se instruksjon fra produsent

Voitelukaavio  

 

8

h

   8 käyttötunnin välein

 

20

h

   20 käyttötunnin välein

  40 F

   40 kuorman välein

  80 F

   80 kuorman välein

 

1 J

  kerran vuodessa

 100 ha

  100 ha:n välein

  FETT

   RASVA

 

 =    Voitelunippojen lukumäärä

 

(IV)

   Katso liite ”Polttoaineet”

 

Liter

   Litraa

 

*   Versio

 

  Katso valmistajan ohjeet

DK

FIN

I

P

NL

S

N

D

gB

F

E

Содержание BOSS L 22T

Страница 1: ...our Votre Masch Nr Fgst Ident Nr 2 4 3 23 3 3 26 5 0AGE 4RADUCTION DE LA NOTICE D INSTRUCTIONS ORIGINALE Ihre Your Votre Masch Nr Fgst Ident Nr R Loader wagon 99 517 GB 80I 0 BOSS L 22 T Type 517 0245...

Страница 2: ...damage is damage caused by a machine and not to it An excess of Euro 500 is provided for such a liabilioty In accordance with the laws of product liability entrepreneurial property damages are exclude...

Страница 3: ...ected Note references in operating manual Fitting to tractor carried out hight of drawbar adjusted brake cable installed hand brake lever assembled in tractor cabin Please check X According to the pro...

Страница 4: ...ohydraulic comfort operation Hydraulic connection 19 Installation and check of comfort operation 20 Functions 21 Trouble shooting 22 LOADING THE TRAILER Adjusting the pick up 23 Impact deflector adjus...

Страница 5: ...service complies with all relevant safety and health requirements CE sign Meaning of warning signs Turn engine off when adjustment service and repair work is to be done 495 163 Wait until all machine...

Страница 6: ...d Therelevant details are located on the right side of the trailer In addition observe the power limits of the tractor being used General safety tips for using the trailer Tips for travelling with the...

Страница 7: ...gerous position changes 13 Check parking brake and service brake functions Before starting work a Before commencing work the operator must be aware of all operating devices and functions The learning...

Страница 8: ...completely up Parking the implement Park the trailer on firm level ground If the ground is soft then the area where the support wheel is to stand must be appropriately increased using a suitable aid e...

Страница 9: ...trailer to tractor The hydraulic cylinder piston must be completely inserted Twist nut 51 until clamp frame 52 is at rightangles about90 tosliprod G Theclamp can then be raised A slot is located in t...

Страница 10: ...lamps 1 andunthreadthecablethrough the support 2 Shorten bowden cable covering see diagram to a point where trouble free cornering is still is possible Rethread cable and secure with cable clamps Chec...

Страница 11: ...utting into operation Before putting the tractor or implement into operation check vehicle safety lights brake unit protective covering Pay attention to correct load distribution during operation Unco...

Страница 12: ...ake care with tractors with a closed hydraulic system JOHN DEERE FORD Serie 40 SLE CASE MAGNUM CASE MAXXUM 1 Close the shut off valve position B 2 Dismount lever 7 and fit onto the shut off valve 11 H...

Страница 13: ...into position II scraper floor drive 3 Engage or disengage the scraper floor drive with the control valve ST Rear operation 1 First shift the lever 61 into the OFF position 2 Put lever switch into po...

Страница 14: ...on the trailer and the tractor are to be used simultaneously by more than one person A conscientiousarrangementshouldbemadebythose concerned before operation An example Danger of injury arises if a p...

Страница 15: ...on Caution Close the selector valve 9 for pick up operation before uncoupling and bring the control valve S into lower or float position Operation error no 2 The wagon with hydraulic drawbar is couple...

Страница 16: ...o be carried out only by specialized workshops Don t connect directly to ignition Don tconnectdirectlytobattery dangeroffireand ordamage of electrical equipment Establishing electric connection After...

Страница 17: ...witching function opening the tailgate switch on the driving gear Pivoting drawbar 1 Lever on control panel in position A 2 Engage servo control ST on tractor Attention Do not engage pivoting drawbar...

Страница 18: ...cock at rear of implement must be shifted to position B Loosen lock nut G Screw in screw H on valve Y2 Shift servo control ST on tractor to raising position Pivoting drawbar is then raised Screw out...

Страница 19: ...w head is level with thesurface 6 ofthehydraulic block Tip If the tractor has a closed hydraulic system and the unit is operating in this position then the hydraulic oil will heat up particularly due...

Страница 20: ...nd the tractor are to be used simultaneously by more than one person A conscientious arrangement should be made by those concerned before operation An example Danger of injury arises if a person stand...

Страница 21: ...ting switch 15 Switch 15 pushed up A rear gate is released and opened Switch 27 pushed down B rear gate is lowered Persons to leave pivoting area Attention While lowering switch stays turned on After...

Страница 22: ...imultane ously set the button in position Y5 Pivoting drawbar is then raised Screw out screw H and lock with nut G Lowering the dry forage extension Lever W in position DA Loosen lock nut G Screw in s...

Страница 23: ...p and press from being unintentionally activated e g when lowering the Pick up while the p t o is running Safety tips Turn off the drive motor and take off the drive shaft when carrying out all adjust...

Страница 24: ...emoval of a quick adjusting cutter unit 1 Swivel flap 47 up 2 Swivel cutter unit down and lift out of housing Maintenance Wellgroundcutterssaveenergyandprovide good cutting quality Caution Only grind...

Страница 25: ...itself a little under its own weight Be aware of lever s A and support strut s jib range 4 Always hold lever A firmly when adjusting and manoeuvre extension slowly 5 Secure left support strut LS first...

Страница 26: ...1 On the switch box in the tractor cabin move the lever to the E2 position or push the switch to position D 2 Actuate the control panel ST 3 The latching hooks are released and the tailgate swings au...

Страница 27: ...45 N From there adjust the relieving spring tension Z accordingly Adjustments So that the opening and closing of the tail gate functions properly set the adjusting screws left and right according to t...

Страница 28: ...l gate swings backwards when opening Unloading with raised top frame Unlock tubular frame to raise hook left and right into position A The tail gate and the tubular frame swing all the way to the top...

Страница 29: ...switch press on cutter bar swings out automatically swing cutter bar in again Top up or replace oil Check chain tension Check chain tension regularly 5 to 8 mm play tighten if necessary Set drawbar t...

Страница 30: ...d by the use of components and accessories that have not been supplied by us d Alterations and the use of auxiliary parts that are not permitted by the manufacturer render all liability invalid Asbest...

Страница 31: ...clean and oil chain as well as lubricating free wheel Cam wheel Grease lubricating point L on head plate of the Pick up every 40 runs 55 Td46 91 6 Tyre pressure Press Regulation of drive chain tensio...

Страница 32: ...f oil according to lubrication chart Cutter gears 0 25 l HD SAE 90 Hydraulic unit Caution Danger of injury or infection Under high pressure escaping fluids can penetrate the skin Therefore seek immedi...

Страница 33: ...6 PR 3 00 200 Nm 10 0 80 12 8 PR 4 20 200 Nm 10 0 75 15 3 6 PR 3 10 200 Nm 10 0 75 15 3 8 PR 4 20 320 200 Nm 10 0 75 15 3 10 PR 5 20 320 200 Nm 11 5 80 15 3 8 PR 3 70 320 200 Nm 11 5 80 15 3 10 PR 4...

Страница 34: ...517 BOSS L 28 T Type 524 Overall length 6300 mm 7540 mm Overall width 2220 mm 2220 mm Height with extension up 2800 mm 2820 mm Height with extension down 2060 mm 2080 mm Platform height 765 mm 705 mm...

Страница 35: ...ansporting and unloading of roughage green forage silage and straw Any other uses outside of these are regarded as undefined The manufacturer takes no responsibility for any resulting damage which occ...

Страница 36: ...GB Anhang Titelblatt _BA Allgemein GB Supplement...

Страница 37: ...heap buy can sometimes be very expensive Be sure you purchase the Original with the cloverleaf sym bol Quality and precise fitting Operating safety Reliable operation Longer lasting Economy Guaranteed...

Страница 38: ...bited a The transport of persons on the machine is not permitted b The machine may only be driven on public roads when in the position stipulated for road transport 7 Driving ability with auxiliary eq...

Страница 39: ...on use clean and lubricate driveshaft For winter working grease the tube guards to avoid them freezing together Matching driveshaft to tractor To determine the actual length required hold the two halv...

Страница 40: ...o protect the implement against damage Driving the right way will avoid triggering the clutch too often and thus causing unnecessary wear on it and the implement Lubricating interval 500 hrs Special l...

Страница 41: ...plug let run out and duly dispose waste oil Before garaging winter season an oil change and greasing of all lubricating points has to be done Unprotected blanc metal parts outside joints etc have to...

Страница 42: ...UNIFARM 15W 30 GEAROIL GP 80W 90 GEAROIL GP 85W 140 MULTI PURPOSE GREASE H FIBRAX EP 370 NEBULA EP 1 GP GREASE GEAR OIL GX 80W 90 GEAR OIL GX 85W 140 ULTRAMAX HLP 32 46 68 SUPER TRAC FE 10W 30 ULTRAM...

Страница 43: ...fter every 8 hours operation 20h after every 20 hours operation 40 F all 40 loads 80 F all 80 loads 1 J once a year 100 ha every 100 hectares FETT GREASE Number of grease nipples IV see supplement Lub...

Страница 44: ...9900 Schmierpl 511 44 1 1 1 6 1 6 6 1 II L II L II L 5 II L 5 TD 55 99 06 hD SAE 0 1 0 Liter II L II L 1 1 2 1 1 II L 3 80 F 40 F 40 F 80 F 1 J 1 J 1...

Страница 45: ...basic safety and health requirements of EEC Directions 98 37 IF APPLICABLE and to the other relevant EEC Directions __________________________________________________________________________ TITLE AN...

Страница 46: ...randeringen van reeds geieverde machines kan worden afgeleid Technische gegevens maten en gewichten zijn niet bindend Vergissingen voorbehouden Nadruk of vertaling ook gedeeltelijk slechts met schrift...

Страница 47: ...s P ttinger Maschinenfabrik Gesellschaft m b H A 4710 Grieskirchen Telefon 0043 0 72 48 600 0 Telefax 0043 0 72 48 600 511 e Mail landtechnik poettinger co at Internet http www poettinger co at Gebr P...

Отзывы: