Flushing an existing installation
1. Remove any sludge from the installation.
2. Flush the installation.
3. Clean the installation with a universal cleaner to eliminate debris from
the system (copper, hemp, flux).
4. Thoroughly flush the installation until the water runs clear and shows
no impurities.
For more information, see
6.8.2
Filling the siphon
1. Clean the siphon.
2. Completely fill the siphon until it overflows.
Danger
Fill the siphon to the top. If the siphon is empty, there is a danger
of poisoning by combustion products.
For more information, see
6.9
Completing installation
1. Reconnect the earth wire and put the front panel back in place.
2. Discard the various packaging items.
3. Affix the data plate found in the instructions bag to a visible part of the
boiler.
For more information, see
6 Installation
7609493 - v08 - 24072018
55