On delivery, the Paramount complies with protection type IPx4D during
room-sealed operation, and it must be installed in protection area 2 (see
figure). In protection area 1, the Paramount only has to be installed if the
maximum water volume at the shower head is less than 10 litres per
minute.
Danger of electric shock
For an installation in protection area 1 or 2, a residual current
device (RCD) with a rated differential current that is no greater
than 30 mA must be provided.
Potterton Commercial does not accept any warranty claims for corrosion
damage caused by a permanent heavy splash load.
To comply with protection type IPx4D, the following conditions must be
met:
Room air-independent operation
All outgoing or incoming electrical lines must be installed through
tension release screw fittings and fixed.
Caution
The screw fittings have to be tightened, so that no water can enter
the inside of the housing!
Operating a room device or thermostat in protection areas 0–2 is not
permitted!
5.4
Transport
5.4.1
General
Danger
Some components, e.g. the preinstalled components or certain
spare parts, exceed the recommended maximum lifting capacity
for individual people that is recommended by employment law.
Risk of personal injury caused by heavy loads.
Do not work alone.
Use the lifting aids.
Secure the unit during transport.
Do not place any other objects on the unit.
Danger
Risk of injury due to the unit tipping over!
When using transport aids, ensure that the weight is distributed
evenly.
Caution
Risk of damage to the unit caused by impact during transport.
The unit must be protected against heavy impacts during
transport.
Notice
You must ensure that any stairs and doors have sufficient
passage width before transporting the unit.
Caution
During transport, only lift the unit onto load-bearing panels or the
parts provided for this purpose for transport.
Notice
Always transport the boiler as close to the installation site as
possible before the packaging is removed.
5 Before installation
36
Paramount five 30 – 115
7703046 - 01 - 23072018
Содержание Paramount five 115
Страница 55: ...For more information see Technical data page 15 7 Commissioning 7703046 01 23072018 Paramount five 30 115 55 ...
Страница 138: ...For more information see Status page 132 State page 132 9 Settings 138 Paramount five 30 115 7703046 01 23072018 ...
Страница 150: ...Gas pressure not stable 11 Troubleshooting 150 Paramount five 30 115 7703046 01 23072018 ...