
2. Installation - Page 13
2.1 Prepare the boiler
These instructions assume you have decided on where the
boiler will be located.
1.
Carefully unpack the boiler.
2.
Do not discard any packaging until all the items are
accounted for.
3.
Position the boiler to ensure the draft diverter is the
required distance from the wall.
4.
Remove the top panel - 2 screws.
5.
Remove the front door - unhook and lift off.
6.
Fit the flue spigot (supplied separately inside the case)
to the draft diverter.
Fig. 9
Содержание Osprey CF 125
Страница 4: ...TECHNICAL DATA Page 4 Fig 2 ...
Страница 11: ...Installation Requirements Page 11 Fig 5 Fig 6 ...
Страница 12: ...Installation Requirements Page 12 Fig 7 Fig 8 ...
Страница 24: ...5 Wiring Diagrams Page 24 Fig 17 ...
Страница 25: ...Wiring Diagrams Page 25 Fig 18 ...
Страница 26: ...6 Fault Finding Page 26 ...
Страница 27: ...Fault Finding Page 27 ...
Страница 28: ...Fault Finding Page 28 Fig 19 ...
Страница 29: ...7 Short List Of Spare Parts Page 29 ...