
9
25/09/2012 - 300029104-001-02
NXR5i
2
`
Establish the location of the frame on the basis of the opening direction of the furnace door and the length of the burner.
Leave enough clearance at the rear of the boiler for water connections and the distributing tube.
Refer to the installation and maintenance instructions of the boiler, Chapter Boiler location.
`
Fit the rear section on the frame, behind the fastening brackets (see detailed drawing) and prop it up.
`
Insert the lower assembly rods in the holes of the rear section and the fastening brackets of the frame, in order to position the rear section
correctly according to the frame
3
`
Clean all the openings in the section with a brush.
Remove any deposit on the bottom of the section.
Boilers: 14, 16, 18, 20, 22, 24 sections
Boilers: 15, 17, 19, 21, 23, 25 sections
00
8
M00
5
Содержание NXR5i
Страница 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Страница 2: ...2 NXR5i 25 09 2012 300029104 001 02 Contents 1 Package list 3 2 Mounting NXR5i 6 3 Data plate 56 ...
Страница 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Страница 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Страница 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Страница 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...
Страница 59: ...59 25 09 2012 300029104 001 02 NXR5i ...