
44
NXR5i
25/09/2012 - 300029104-001-02
48 package MR338 or MR339
Assembling the furnace door and lower crosspiece panels
Put the furnace door panel in place (package MR338 or MR339) and fasten with 2 tapping screws (Ø 3.94 x 12.7).
The furnace door panel may be cut in 2 at the micro-joints.
Fix the casing support lower crosspiece (package MR338 or MR339) by means of 2 screws (H6 x 20) and 2 serrated washers.
49 package MR338 or MR339
Assembling the control panel bracket (all control panels)
Fit the 4 "Rapid" nuts on the front of the cable channels.
Fit the "Rapid" nuts in the slots
:
4 "Rapid" nuts for 7 to 17 sections.
8 "Rapid" nuts for 18 to 25 sections.
Fix the control panel bracket (package MR338 or MR339) underneath the 2 cable channels by means of 2 screws (H8 x 16) and 2 serrated
washers.
1
M000
12
1
2
M000113
1
2
2
3
Содержание NXR5i
Страница 1: ...NXR5i Fuel oil gas boilers Assembly Instructions C003966 A 300029104 001 02 EN ...
Страница 2: ...2 NXR5i 25 09 2012 300029104 001 02 Contents 1 Package list 3 2 Mounting NXR5i 6 3 Data plate 56 ...
Страница 46: ...46 NXR5i 25 09 2012 300029104 001 02 51 L000068 B C003955 B 3 4 2 4 4 1 ...
Страница 47: ...47 25 09 2012 300029104 001 02 NXR5i 52 53 C003956 B 1 3 4 2 C003957 ...
Страница 57: ...57 25 09 2012 300029104 001 02 NXR5i ...
Страница 58: ...58 NXR5i 25 09 2012 300029104 001 02 ...
Страница 59: ...59 25 09 2012 300029104 001 02 NXR5i ...