Teleline HVI Single 5-card Shelf Cabinet, model 751960/13CU5
3.5
Installation Procedures and Sequence
The following sequence of procedures should be followed to insure a safe and
easy installation.
Q
If the splicing of the dedicated cable to the general use cable is started
or accomplished early in the designed work sequence, a safety hazard
will exist. That safety hazard will then require the use of a rubber mat
and rubber safety gloves for the remaining installation work to protect
personnel against Ground Potential Rise and/or transients.
Q
Additionally, as a safety issue, it is recommended that the installation be
done on a clear day with no lightning activity.
Table 4: Additional Hardware Required
Quantity
Description
Use
4
3/8” diameter studs or lag bolts
Form mounting to the supporting surface
4
3/8” washers
For use with the mounting fasteners
1
Connector
For the Grid Ground wire to the #6 cabinet
ground wire connection
³
Unpacking the Unit
1. Cut the packing straps holding the cabinet box to the pallet.
2. Open the cabinet and remove any packing material.
3. Remove any other loose items and set aside for later use.
C
AUTION
Содержание Teleline 751960/13CU5
Страница 2: ......
Страница 6: ......
Страница 7: ...Chapter 1 General Information...
Страница 14: ......
Страница 15: ...Chapter 2 Overview...
Страница 17: ...17 Introduction Figure 1 HVI Pre configured Unit 751960 13CU5...
Страница 20: ......
Страница 21: ...Chapter 3 Installation...
Страница 51: ...Chapter 4 Thermal Considerations...
Страница 57: ...Appendix A Acronyms...