5.3.7 Synchronism test
This function is for checking the performance of synchronism relay
Condition: power supply frequency, 50Hz or 60Hz.
Connect wires as above figure shown.
Select the synchronizing test menu as above figure shown.
Set amplitude and phase of voltages from the menu.
Press the
Run
button to output the voltage value, change the phase of voltage, if
the relay trips, record the corresponding phase angle difference.