background image

                                                                                                           

PDC4000A Instruction Manual 

 

 
 
 
 

PONOVO POWER CO., LTD

 

 

2F, 4Cell, Tower C, In.Do Mansion 
No.48A Zhichun Road, Haidian District 
Beijing, China (Post Code 100098)

 

 

Office 

TEL. +86 (10) 82755151-8887   
FAX +86 (10) 82755257 

 

E-Mail [email protected] 

 

Website www.ponovo.com.cn 

 

 
 
 
 

 

 

PDA4000 

HARDWARE INSTRUCTION MANUAL

 

 
 

VERSION: 

    

PDA4000-AE-1.00

 

DATE: 

     25/10/2011 

 

 

 
 
 
 
 
 
 
 
 
 

This manual is the publication of PONOVO POWER CO., LTD Any form of copy needs to 
be consent by PONOVO POWER CO., LTD 

 

This manual represents the technical status for the moment of publishing. The product 
information, description and specifications mentioned in the manual do not have any 
contact binding force and PONOVO POWER CO., LTD remains the right to make 
modifications to the technical specifications and configurations without prior notice. 
PONOVO does not take responsibility to the possible error/mistakes in this manual. 

 
 

 
 
 

Содержание PDA4000

Страница 1: ...011 This manual is the publication of PONOVO POWER CO LTD Any form of copy needs to be consent by PONOVO POWER CO LTD This manual represents the technical status for the moment of publishing The product information description and specifications mentioned in the manual do not have any contact binding force and PONOVO POWER CO LTD remains the right to make modifications to the technical specificati...

Страница 2: ...B power supplies are open circuit It continues working after over hot recovery The output of serial connection is suitable for loaded voltage above 4V and when the loaded voltage is below 4V serial connection is prohibited Over loaded alarm exists when connecting in parallel The tester is working when it is overloaded in single circuit or parallel connection but the output time is less than 20 sec...

Страница 3: ...ental conditions 7 4 Operation Instructions 7 4 1 Select test functions 7 4 2 Choose variables 8 4 3 Set test parameter 8 4 4 Output control 8 4 5 Check and save test report 9 4 5 1 Check test report 9 4 5 2 Save test report 9 4 6 System settings 9 5 Test functionality instructions 9 5 1 Manual test 10 5 1 1 Channel A output 10 5 1 2 Channel B output 11 5 1 3 A B serial connection 12 5 1 4 A B par...

Страница 4: ...ary 2 no polarity It can be used to receive protection connection point and milliseconds test and single or dual channel are optional 3 Indication lamp Run lamp output indicator Over hot indicator The lamp alarms and flash when the temperature of internal power model is above 80 and output is cut Over load indicator The lamp flashes when the current and voltage are over loaded and manually stops t...

Страница 5: ...0A 0 1 0 1 240s 1000A 0 8 0 1 60s 2000A 0 8 0 1 1 99 raising Time 0A 200A 0A 500A 0A 1000A 0A 1500A 0A 2000A 50ms 100ms 100ms 100ms 100ms 99 1 falling Time 200A 0A 500A 0A 1000A 0A 1500A 0A 2000A 0A 50ms 50ms 50ms 50ms 50ms Model PDC4000A Output model Group A B connecting in series Output range 100A 4000A Accuracy 0 2 Port voltage 200A 1600A 4000A 4 1V 4 0V 3 8V Precision of Max current fully load...

Страница 6: ...n and time accurate of 1ms 0 001 1s 0 1 1 999 999s 99 1 Falling time 400A 0A 1000A 0A 2000A 0A 300A 0A 4000A 0A 50ms 50ms 50ms 50ms 50ms Model PDC4000A Output model Group A B connecting parallel Output range 100A 2000A Accuracy 0 2 Port voltage 100A 800A 2000A 8 2V 8 0V 7 6V Precision of Max current fully loaded output time 100A 1000A 2000A continuously 40s 80s 10s 20s 0 1 0 1 0 1 0 1 0 2 0 1 0 1 ...

Страница 7: ...ble 380V 50Hz input voltage range 10 20 50Hz 3 6 Dimension and weight Dimension 660mm x 425mm x 765mm L W H Weight 95kg 3 7 Environmental conditions Temperature 5 45 Relative humidity 90 non condensing Atmospheric pressure 86kPa 106kPa 4 Operation Instructions 4 1 Select test functions There are four buttons F1 F2 F3 and menu in the test unit area Choose main menu button at any interface to enter ...

Страница 8: ...eration is displayed in white with background of black 4 3 Set test parameter Change variable parameter by pushing ENTER button and rotating it clockwise and counterclockwise Select parameter step by pushing coarse fine tuning The step changes among 0 1 1 and 10 Relative parameters can be set by selecting variable settings before testing And the parameters cannot be changed during testing 4 4 Outp...

Страница 9: ...eports can be stored 1 3 means that there are three pages and the present is the first page 4 5 2 Save test report After testing the present project can be saved through screen tips and test report is saved in the form of date and time 4 6 System settings Screen backlight buzzer and time can be set by choosing main menu system settings 5 Test functionality instructions The following is the main me...

Страница 10: ...tion and A B parallel connection Current output of A B A B serial connection can get 2000A maximum and A B parallel can put out 4000A current which can control current amplitude and output time manually and test opening time This is the operation interface 5 1 1 Channel A output Connect the cables as followings ...

Страница 11: ...ich is connected with the present current output time and maximum time is 120s After cooling it can go to next output The equipment needs 30s cooling time after power on and it counts from current output until that the binary receives signal flip recording actions time Notes The cooling time means the minimum cooling time for the equipment normal working It is advisable that the real cooling time ...

Страница 12: ...l output current in Channel B 5 1 3 A B serial connection Connect the cables as followings All operations are the same to Channel A Lout means the real output current collected in Channel A IA means the real output current collected in Channel A IB means the real output current collected in Channel B ...

Страница 13: ...ted in Channel A and B IA means the real output current collected in Channel A IB means the real output current collected in Channel B 5 2 Online test Main functions of online test are transmitting test report to PC and test step grading and state sequence 6 Accessories 1 250 fixture 2 sets It is used for testing bus cable with diameter of 250mm seeing the installation below ...

Страница 14: ...with diameter of 50mm seeing the installation below 3 30 bush 10 sets It is used for testing bus cable with diameter of 30mm seeing the installation below 4 4000A installation bus cable 2 stripes It is used for connecting equipments and fixture seeing the installation below 5 2 wrenches ...

Страница 15: ...PDC4000A Instruction Manual 15 6 Tandem arrangement Parallel row 7 Power wires Yellow green red Blue Yellow green L1 L2 L3 no phase sequence Zero line N Earth wire Fitting one Bus dedicated connector ...

Страница 16: ...n Manual 16 High intensity air box is used for package box and there are three floors In the first floor there is 250 fixture In the second floor there are 50 and 30 fixture In the third floor there is testing bus cables ...

Страница 17: ...crocodile clip one tandem arrangement two parallel rows two wrenches and a set of screw nuts Installation of test fixture 1 Bus Diameter is 250mm First clean the bus where the fixtures are installed and connect 250 fixture and bus cables showing in the picture Fasten the connection with screw nut showing below ...

Страница 18: ...here the fixtures are installed and connect 50 fixture and bus cables showing in the picture Fasten the connection with screw nut If there are several bus cables 4 bus cables with diameter of 50mm can be connected to the bus cables front back left and right respectively and the loaded current is approximately 4000A showing below ...

Страница 19: ...es are installed and put bushing 30mm into fixture 50mm and the tested bus cables Installed as the following Fasten the connection with screw nut If there are several bus cables 4 bus cables with diameter of 50mm can be connected to the bus cables front back left and right respectively and the loaded current is approximately 4000A showing below ...

Страница 20: ...PDC4000A Instruction Manual 20 Connect the other end of bus cable with the equipment ...

Отзывы: