PONNDORF Gerätetechnik
GmbH
Leipziger Strasse 374
D - 34123 Kassel
Operation manual
Hose Pump series
P_classic / PC-S
Page 12 von 30
Version 005_GB / 04.2021
- Remove and dispose grease in accordance with local
regulations.
- Dispose any leaking pumped liquid in accordance with local
regulations.
- Neutralize residues of pumped liquid in the pump.
•
Dispose of the pump unit and associated parts in accordance with
statutory regulations.
5.
Description of pump and accessories
The pump head is connected with the drive by a coupling. Pump head and drive are
completely mounted on a base plate. Construction "XXX" means that the pump head
is supplied with bare shaft extension.
Construction
Description
- XXX
- pump head with bare shaft extension, without drive
- GMC
- GMC-TF
- GMC-FF
- GMC-I1/I3
- GMC-V1/V3
- pump with gear motor
- pump with gear motor incl. thermistors for frequency converter use
- pump with gear motor incl. thermistors and forced fan
- pump with gear motor with integr. frequency converter
- pump with gear motor with integr. frequency converter and forced fan
-BDC
- pump with variable speed drive
P_classic 10 /
PC_10-S
P_classic 15 /
PC_15-S
P_classic 27 /
PC_27-S
P_classic 35 /
PC_35-S
P_classic 50 /
PC_50-S
Material pump casing:
Aluminum alloy
Material base plate:
Steel (standard)
Paint of pump:
RAL 5003 (standard)
Diameter of shaft:
Fit:
10 mm
H7/k6
15 mm
H7/k6
15 mm
H7/k6
25 mm
H7/f7
25 mm
H7/k6
Содержание P Classic 10
Страница 1: ...Hose Pump Series P_classic PC S Operation Manual...
Страница 2: ......