
3-19
3 First Steps
3.5
Functional Test
The implementation of a first functional test is described in the following. If the
instrument does not perform as described, contact your local Polytec
representative.
For an initial functional test, proceed as follows:
1. Mount the instrument as described in S
2. Connect up the instrument as described in S
3.4.
Switch on
3. Turn the key switch on the front of the controller to position
I
.
In doing so, the sensor head is also switched on.
INFORMATION
The instrument reaches its optimal metrological properties after a warm-up
period of approx. 180 minutes.
4. Press the mains switch on the back of the industrial PC to position
I
.
5. Press the
POWER
key on the front of the industrial PC.
6. Start the TMS software.
7. Open a measurement window as described in your TMS software manual.
The video camera is working correctly if no error message is shown
when starting TMS software. The live video image is displayed in the
measurement window.
If you have locked the transport lock on the sensor head, the TMS
software shows an error message.
After successful initialization, the measurement light will light up green
and you will see the video image.
INFORMATION
The object support should be at least the same height as the default position
so that the object is positioned within the measurement range.