Part/Kit no.
Item
Item
no.
Item Sample
Item
Quantity
Rack spacer
assembly kit
Rack spacer
3
Front & Rear
4
Flat head screw - M5*10mm
4
8
Rail runner
assembly kit
Flat head screw - M3*8mm
5
4
Flat washer M3
6
4
Nut spring M3
7
4
Collaboration
Server chassis
assembly kit
Pan head screw - M5*12mm
8
2
Flat washer M5
9
2
Install the Telescopic Rail Runners on the Rack
Rack Rail Runners require a minimum of 48 cm and a maximum of 80cm within the rack for installation.
Procedure
To install the Telescopic rail runners on the rack:
1.
Determine the location of the Collaboration Server on the rack:
• Allow for a 1U gap above and below the system for ventilation.
• Use the Rack Spacer (item no. 3) to predetermine its position on the rack post, making sure
that square studs of the spacer fit into the rack post's square/rounded mounting holes. Mark
the spacer's location on the rack post. Repeat this process for the 3 remaining vertical posts
ensuring that the system can be horizontally seated.
Appliance Edition Installation
Polycom, Inc.
15