Podab ProLine FC 20 Скачать руководство пользователя страница 1

Drying cabinet ProLine FC 20

Installation and operation manual

Содержание ProLine FC 20

Страница 1: ...Drying cabinet ProLine FC 20 Installation and operation manual...

Страница 2: ...2 PODAB 2019...

Страница 3: ...Step 4 Connect the drying cabinet to the main switch 18 Step 5 Control that the heating relay is working 18 Requirements for ventilation 19 Ventilation channel choice of material 19 Requirements for...

Страница 4: ...R SAFETY the information in this manual must be followed to prevent property damage and personal injury NOTE The paragraphs marked WARNING and CAUTION appearing in this manual are not meant to cover a...

Страница 5: ...er vice on the cabinet Only authorized service technicians should perform service 9 Always follow the installation manual The electrical con nections must be installed by authorized personnel 10 Keep...

Страница 6: ...g min 55 46 Drying time min 166 65 Energy consumption kWh 19 6 6 8 Drying of 20 kg fire suits dry weight washed and high spinned to 5o residual moisture for membrane suits and 15 for cotton wool suit...

Страница 7: ...7 PODAB 2019 1 4x Tools You need the following tools to easily install the drying cabinet FC 20 Cordless screwdriver Wrench Hex key 3 and 5 mm Level Torx screwdriver bit no 25 Assembly instructions...

Страница 8: ...8 PODAB 2019 4 6x 3 2 5x...

Страница 9: ...9 PODAB 2019 7 5 4x 9x 6 repeat step 3 5 6x...

Страница 10: ...10 PODAB 2019 10 9 1x 6x 1x 8...

Страница 11: ...11 PODAB 2019 13 11 12 2x 13x 13x...

Страница 12: ...12 PODAB 2019 16 14 15 2x 6x 4x...

Страница 13: ...13 PODAB 2019 19 17 18 2x...

Страница 14: ...14 PODAB 2019 22 20 21 2x...

Страница 15: ...15 PODAB 2019 25 23 24 8x 8x...

Страница 16: ...16 PODAB 2019 26 Connect the cables Humidity sensor HUMIDITY Control board Temp sensor NTC1 Relay board X11 Door switch DOOR Lights LIGHT Relay board 27 2x...

Страница 17: ...17 PODAB 2019 28 29 4x...

Страница 18: ...r and control that the cabinet is leveled horizontally and vertically NOTE We recommend that the cabinet is installed on a firm and leveled floor Step 4 Connect the drying cabinet to the main switch N...

Страница 19: ...shall always be separated from the other ventila tion in the house Requirements for incoming air In order to make the cabinet work properly it is very important that there is enough incoming air in t...

Страница 20: ...tion Check the part pressure fall for each component in the table Calculate the total amount of pressure fall by adding each parts pressure fall The table shows the most common components in a ventila...

Страница 21: ...abin is also turned off if the door is open Automatic programs The drying cabinet is equipped with the function HTS Humid ity Tracking System This function is activated in the automatic program mode T...

Страница 22: ...ys switch off the electricity before start ing to work with the cabinet Inspect with set intervals the complete ventilation channel don t forget the outer wall There can easily be leafs and other rubb...

Страница 23: ...23 PODAB 2019 Notes...

Страница 24: ...AB PODAB Ekonomiv gen 9 436 33 Askim SWEDEN Tel 46 0 31 752 01 00 E mail export podab se www podab com SERVICE SUPPORT Phone 46 31 752 01 70 E mail support podab se www podab com PODAB 2019 12 02...

Отзывы: