PneumaticPlus SAR4000 Series Скачать руководство пользователя страница 1

 

AIR REGULATOR INSTRUCTION SHEET 

SAR4000 SERIES  

Standard Units: Relieving  
Maximum Supply Pressure: 250 PSI  
Maximum Operating Pressure: 150 PSI 
Operating Temperature Range: 40

 F to 140

 F  

Installation 

 

User must verify that the regulator is rated for the system operating pressure and has 
the proper connections and accessories for the type of gas and pressures required for 
their application.  

 

Inspect the regulator for evidence of contamination or damage.  Regulators with any 
signs of contamination or damage should not be used.   

 

When installing the regulator to the airline, reference the arrow on the front and back 
of the regulator for air flow direction. 

 

Use a filter to remove dirt and supply clean air to your application.  

Filter must be 

installed ahead of the regulator

.  

If an airline lubricator is used, it MUST be located 

downstream of the regulator to avoid any interference with regulator.   

Note:  Do not apply excess torque when installing the regulator and/or gauge.  We recommend 
use of liquid Teflon over Teflon tape.  

Operation & Adjustments 

 

Before supplying the air, turn the adjusting knob counter-clockwise until 
compression is released from the control spring.   Turn on the air supply and adjust 
the knob to set the desired secondary pressure by turning the knob clockwise.   

Note:  Adjustment knob must be pulled away from the body of the regulator to operate.   After 
desired secondary pressure is set, pushing the knob back towards the body will lock the 
control knob.   

Warning 

FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THE PRODUCTS 
AND/OR SYSTEMS CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY 
DAMAGE 

To avoid unpredictable system behavior that cause personal injury and property damage, 

 

User must be trained and equipped for the handling, use and servicing of high 
pressure fluids and systems. 

 

Follow all applicable safety and maintenance procedures. 

 

Obey local, government and agency codes and regulations. 

 

Disconnect electrical supply if necessary before installation, servicing or conversion. 

 

Disconnect air supply and depressurize all air lines connected to this product before 
installation, servicing or conversion. 

 

Operate within the manufacturer’s specified pressure, temperature and other 
conditions listed in these instructions.

 

STRUCTURE/PART 

 

 

MAINTENANCE

 

:On detection of air leaks, 
pressure fluctuation, or “creep”, 
depressurize system and 
remove bottom cap. Inspect 
valve seat for damage or wear. 
Inspect seat in head casting 
for foreign material or damage. 
Clean with kerosene and blow 
out with air. Replace 
any damaged parts. If leaks 
persist, remove bonnet, inspect 
diaphragm and diaphragm 
seat for wear or foreign 
materials. 

Отзывы: