EVO 2.0 EW
A S S E M B LY I N ST R U C T I O N S
O N LY
F I V E ST E P S
T O T H E C O M P L E T E SYST E M
Страница 1: ...EVO 2 0 EW ASSEMBLY INSTRUCTIONS ONLY FIVE STEPS TO THE COMPLETE SYSTEM...
Страница 2: ...tions Before installation verify whether the product meets the static requirements applicable on site For roof systems also check the load bearing capacity of the roof National and local building regu...
Страница 3: ...3 PMT EVO 2 0 EW Components A Edge profile B Main profile C Base D Main profile connector F Cross and ballast strut Screw M8 x 30 E Tower G Cross strut conector H Ballast stone I Middle and end clamp...
Страница 4: ...4 PMT EVO 2 0 EW Required Tools 1 Tape measure 2 Chalk line 4 Distance gauge 3 Torque wrench with attachment SW 5 mm allen key socket...
Страница 5: ...D and Base C Attention Check the latching connection for proper fitting PMT Tip Set up the rows of main profiles with the spacing specified in the planning documents Use the supplied spacing gauge be...
Страница 6: ...6 PMT EVO 2 0 EW 2 Place and mount Tower E E 2 1 2 2 CORRECT CLICK CLICK INCORRECT...
Страница 7: ...7 PMT EVO 2 0 EW 3 3 1 3 2 G F F F M8x30 10Nm Minimum 15 mm F Secure cross and ballast strut F to cross strut connector G...
Страница 8: ...stone H 3 4 Ballast stones Secure ballast stones 1 2 as described using middle clamps Put on ballast stones 3 4 and push them towards the tower Maximum 135 kg per ballast strut arrangement Always ref...
Страница 9: ...VO 2 0 EW 5 Mount middle and end clamps I and screw on the modules INCORRECT Assembly on the Tower CORRECT Assembly on the Base Middle clamp I Minimum 20 mm 10Nm CLICK End clamp I 10Nm DONE CORRECT IN...
Страница 10: ...remium Mounting Technologies GmbH Co KG Industriestr 25 D 95346 Stadtsteinach T 49 9225 9550 0 F 49 9225 9550 999 info pmt solutions www pmt solutions Assembly Instructions PMT EVO2 0 EW V1 07 2021 Se...