background image

USER

 

MANUAL

VERO

  profile

  700

10

.

Maintenance Cleaning

The following points have to be considered during the inspection:
1)All screw for installing the devices or parts of the device have to be tightly 
connnected and must be corroded.
2)There must not any deformations on the housing,color lenses,fixations 
and installation spots(Ceiling,suspension,trussing)

3)Mechanically moved parts must not show any traces of wearing and must 
not rotate with unbalances.
4)The electric power supply cables must not show any damage,material 
fatigue or sediments

CAUTION!

Disconnct from mains before starting maintenance operation.

Futher instruction depending on the installation spot and usage have to be 
adhered by a skilled installer and any safety problems have to be removed.

In order to male the lights in good condition and extend the life time, we 
suggest a regular clearning to the lights. 
1)Clean the inside and outside lens each week to avoid the weakness of the
 lights due to accumulation of dust.
2)Clean the fan each week.
3)A detail electric check by approved electrical engineer each three month, 
make sure the circuit contacts are good condition, prevent the poor contact 
of circuit from overheating.  

We recommend a frequent cleaning of the device.Please use a mosit,lint-free 
cloth.Never use alcohol or solvents.
There are no seviceable parts inside the device.Please refer to the instructions
 under Installation 
instructions.

www.piu39av.com

Отзывы: