Plura RUB VI Скачать руководство пользователя страница 6

Functional Description and Specifications RUB VI 

Page 6 

 

Module VI 

1.1  Description 

This  module  distributes  and  amplifies  one  input  to  six  LTC  (EBU/SMPTE)  or  IRIG  time  code 

outputs.  A  seventh  spare  output  stage  together  with  a  changeover  relay  at  each  of  the  six 

outputs  enables  completely  redundant  output  signals.  Each  output  stage  is  monitored  for 

signal failures. Alarm outputs are available as SNMP, GPI OUT, LEDs and lamps.   

PC

 or the 

RUB IE

 module is required for the configuration of this module. 

The front panel label 

VI

 visibly identifies where each module is located.  The serial number is 

located on the bottom side of the lower circuit board of each module. 
The standard hardware of this module has all of the following key features:  

 

“Hot  Swapping“,  i.e.  it  is possible  to  insert  or  remove  a  module  without interrupting  the 

operation of other modules in this frame. 

 

Failure relay, connected to the FAIL_A and FAIL_B pins of the 

RLC

 connector at the rear of 

the frame. 

 

RS232  and  TC_link  (RLC  connector)  interfaces  to  have  access  to  the  internal  bus  of  the 

chassis. 

 

Four programmable function keys, lamps and LEDs on the front panel (RUB1 version only). 

 

Flash memory containing the firmware, so configuration and updates are possible via a 

PC connection. You can download the latest version of the program from: 

https://www.plurainc.com

. 

 

One LTC/IRIG input. 

 

Six independent LTC/IRIG outputs plus one spare output, individually monitored. 

 

Changeover relays enable completely redundant output signals. 

 

Alarm outputs indicating failures and warnings: Lamps and LEDs (RUB1 version only), GPI 

OUTs and SNMP traps. 

1.2  LTC or IRIG-B 

The module reads and monitors LTC or IRIG-B. According to your application please select the 

correct  type  of  time  code  by  setting  or  removing  a  jumper  at  the  lower  circuit  board.  This 

configuration already will be done if you add a small note (LTC/IRIG-B) at your order. 

Ju

m

pe

r b

et

we

en

pi

ns

 6

 a

nd

 8

:

LT

no

 ju

m

pe

r

IR

IG

-B

 =

 ju

m

pe

r

8
6

2

1

Re

ar

FR

ON

T

 

Содержание RUB VI

Страница 1: ...Functional Description and Specifications Version 3 1 June 19 2020 RUB VI LTC or IRIG Time Code Distribution Amplifier Supplement to the Installation Systems Manual RUBIDIUM SERIES...

Страница 2: ......

Страница 3: ...ATE 10 2 OPERATING DESCRIPTION 11 2 1 FUNCTIONAL OVERVIEW 11 2 2 MONITORING AND STATUS INFORMATION 12 2 3 SIGNAL CHANGEOVER 14 2 4 ERRORS AND ALARMS 15 3 STATUS MONITOR 18 3 1 STATUS MONITOR BY THE IE...

Страница 4: ...hanical photocopying recording or otherwise without the prior written consent of Plura Europe GmbH Printed in Germany Technical changes are reserved All brand and product names mentioned herein are us...

Страница 5: ...l RUBIDIUM SERIES Please read the below listed chapters of the Installation Systems Manual RUBIDIUM SERIES as these chapters are necessary for the safe and proper use of the Rubidium module VI A3 Warr...

Страница 6: ...relay connected to the FAIL_A and FAIL_B pins of the RLC connector at the rear of the frame RS232 and TC_link RLC connector interfaces to have access to the internal bus of the chassis Four programma...

Страница 7: ...PI_4 2 GPI_1 3 GPI_5 6 GPI_2 4 GPI_6 5 GPI_3 7 GPI_7 OUTPUT DSUB25F female 1 GND 3 GND 5 GND 7 GND 9 GND 11 GND 2 OUT1_A 4 OUT2_A 6 OUT3_A 8 OUT4_A 10 OUT5_A 12 OUT6_A 14 OUT1_B 16 OUT2_B 18 OUT3_B 20...

Страница 8: ...lector output of an NPN Darlington transistor Max power dissipation 200 mW High state external pull up needed to a positive power source of less than or equal to 30 VDC typically 1 k when connected to...

Страница 9: ...INPUT VI VI LTC PrimaryCircuit 1 5 2 Example of a Redundant IRIG B Distribution System 18 Outputs 1 RLC PC 1 RLC PC PS PS PrimaryCircuit2 PrimaryCircuit1 1 GPI B GPI A REF IN IRIG IRIG 8 1 8 1 8 1 8 1...

Страница 10: ...ht 1 1 connection between the PC connector at the RUBIDIUM frame and the RS232 of the computer In case of an USB interface Use a USB A B cable between your computer and the RUBIDIUM frame Switch on th...

Страница 11: ...hangeover Changeover Changeover The monitoring part outputs the following status Input signal status Time decoded out of the input signal Status of each output channel State of all changeover relays E...

Страница 12: ...le time data An error detected at the spare output could be considered as an error of the signal input There is a changeover relay at each of the six outputs If an error is detected at an output stage...

Страница 13: ...signal at all or LTC with incorrect time addresses Spare output stage Signal failure for one second or more Channel 1 to channel 6 output stages Signal failure for two seconds or more fail of IRIG B N...

Страница 14: ...put signal status OK time out data error input signal received yes no An error at the spare output stage will not affect the changeover relays The changeover relay will open its contacts if no error c...

Страница 15: ...an LED or lamp at the module and or by an SNMP trap Errors Any error detected on a signal always leads to the following error indications At the status monitor The total number of errors counter show...

Страница 16: ...f the RUB IE module with option S SNMP Utilizing one of the configuration tools SNMP traps can be enabled and disabled at the System page please refer to chapter System Identification Reset SNMP Fan C...

Страница 17: ...ations are self resettable reset if no errors are present The individual status bits at the status monitor GPI outputs The Signal Failure SNMP traps The following error indications remain as long as t...

Страница 18: ...and how to open the RUBIDIUM homepage At the RUBIDIUM homepage click on Configuration to open the Configuration page Click on VI on the left Click on the button Status Monitor to open the VI status mo...

Страница 19: ...ad at https www plurainc com Execute this program select the COM port or USB connection and press the scan button to get a list of the modules plugged to this housing Select the module and press the c...

Страница 20: ...20 3 3 System Status This module monitors the signals at the seven output stages with respect to frequency minimum amplitude and plausible time data The status monitor informs about the state of each...

Страница 21: ...total number of errors 0 lamp 1 on off on if any alarm has been set total number of alarms 0 lamp 2 on off No function lamp 3 on off on if input signal is present IN corresponds to the spare output l...

Страница 22: ...s of Fan and Power Supplies This module as all configurable RUBIDIUM modules is able to monitor the fan and power supplies which are plugged to the same housing as VI Please refer to the document Inst...

Страница 23: ...Overview Installation Connection to RUBIDIUM SERIES Chassis Starting the Program Store Load and Update the Configuration on your PC The Profile Tab Store and Load Configurations on the Module The prog...

Страница 24: ...ERIES Module The Profile Page Store and Load Configurations on the Module or on the PC As soon as a communication to a single module has been established the Configuration page gives a list of all lin...

Страница 25: ...Edit Use Function is deactivated the tab page is not visible Function is activated the tab page is visible and configurable Function is activated but the tab page not visible and therefore not config...

Страница 26: ...asically the functions of these in and outputs are programmable Some functions presented by the configuration tool maybe assigned to special options and therefore are not applicable with the standard...

Страница 27: ...alarm has been set total number of alarms 0 Reset by key FAIL or RESET or button ERROR RESET of a configuration tool F1 FAIL Lamp IN Lights up if an input signal is present or spare output signal is p...

Страница 28: ...at seven output stages Six signal outputs one spare output There are changeover relays at each of the six outputs If a signal output fails a changeover to the spare output via relay can be done The D...

Страница 29: ...lue 1 to 6 Select this parameter according to your application Channels Each output stage except the spare output has a changeover relay The operating mode of each relay can be selected individually A...

Страница 30: ...module If you select Auto the module will request this frame number automatically and will show it on the info box Likewise it is possible to select a frame number manually Boot Cold Boot Do a cold b...

Страница 31: ......

Страница 32: ...U S A Germany U A E S Korea www plurainc com...

Отзывы: