![PLEIGER ELEKTRONIK PMC 2000 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/pleiger-elektronik/pmc-2000/pmc-2000_manual_1567726041.webp)
PCL
Pleiger Elektronik GmbH & Co. KG
www.pleigerelektronik.de
Fon +49 2324 398 333
40
/
65
Pleiger Control Loop
Manual version 2018-03
On the right side is a field that indicates
•
the proper busmaster which is connected to the node, or
•
if the node is connected to the wrong master (SM
secondary master), or
•
if there is no connection to the node (OF).
Selection of the node name will change into the picture of the advanced operation with analyzing func-
tion.
There is no selection of a node available when the connection to the busmaster is defect:
Figure 10-22: Data loop page if no connection to a busmaster is available
10.3.1 PLC node
The upper part of the picture is identical to the picture of the backup operation.
Additionally there are details of the state of the bus system indicated and parameters of the node can
be modified in the lower part of the picture.