background image

22

Sun Lounge Assembly Instructions

Assemble the Door (Right Entrance Option)

Assemble the lower portion of the door.

Lock the connectors in place with pins.

Remove the plastic film from a PN1 panel.

Slide the PN1 panel into the lower portion of the 

door in the side channels.

Assemble the upper portion of the door. Place the 

DoorW1 door handle connector on the left side of 

the door.

Note: 

The larger handle always faces the outside.

Screw the Dow1 Lock Holder through the E2 profile 

in the pin hole.

Lock the parts of the door in place with pins.

Remove the plastic film from a PN53 panel.

Slide the PN53 panel into the upper portion of the 

door.

Attach the Door12 Slider to complete the door.

Lock the parts of the door in place with pins.

Take the roll of GF sealer and pull out enough for the 

bottom of the PN1 panel and cut it to length.

Note: 

Split the GF sealer before you cut it

Align it with the channel of the E2 profile.

Push it in to seal the PN1 panel with the GT1 pin & 

glazing tool. Repeat for the top of the PN1 panel and 

the bottom and top of the PN53 panel.

Take the roll of GF sealer, pull out enough for one 

side of the PN1 panel, cut it to length, and align it 

with the channel of the E1 profile.

Push it in to seal the PN1 panel with the GT1 pin & 

glazing tool. Repeat for the other side of the PN1 

panel and also for the upper PN53 panel.

Содержание Rion Sun Lounge

Страница 1: ...greenhouses garden sheds outdoor garden elements and accessories Designed and manufactured by Rion A Member of the Plasson Group Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email...

Страница 2: ...0999 sales oldfields com au http www oldfields com au treco index htm Germany CLEMENS HOBBYTEC GmbH Rudolf Diesel Str 8 D 54516 Wittlich Germany 49 0 6571 929 222 Fax 49 0 6571 929 198 info clemens h...

Страница 3: ...cessary Close all roof vents in high winds It is important to clear your Greenhouse of snow in the winter If you live in a hot climate where outside temperatures exceed 46 C 115 F in the sun or 36 C 9...

Страница 4: ...ement into the profile until it snaps into place Push the glazing element along its length Continue until the end of the glazing element snaps in place The callout shows an enlarged cross section of t...

Страница 5: ...and tools are included Wood Deck Your Sun Lounge can be secured to a wood deck with screws not supplied through the frame connectors Use screws that are 6 mm B in diameter and no less than 70 mm 2C l...

Страница 6: ...sing The part code is stamped on each connector Profiles are listed in order by size largest to smallest Panels are identified with stickers Exact dimensions can be found in the packing list Part Code...

Страница 7: ...3 E1 5 3 1 Oval Profile 113 cm 3 8A E16 1 1 1 Oval Profile 135 cm 4 5L E2 7 8 2 Oval Profile 54 cm 1 9B E15 1 1 1 Oval Profile 80 1 cm 2 7L E13 4 2 0 Oval Profile 60 6 cm 1 11G SR1 1 0 0 Inner Round...

Страница 8: ...Left WIN41 0 1 0 Roof Vent WINH31 0 1 0 Roof Vent Handle GF 28 31 3 Flexible Glazing Seal m DSN 1 0 0 Door Sealer packages RB8 2 2 1 Roof Glazing 129 cm 4 2N RB7 2 2 1 Roof Glazing 79 cm 2 7D RC8 2 2...

Страница 9: ...oor lead Note Arrange all 2D connectors with the stamped word OUT facing the outside of the greenhouse Place the other parts of the frame in place and lock it together with pins For Sun Lounge with Ri...

Страница 10: ...oncrete Foundation Insert screws into the frame connector holes and secure them to the wood deck or modular base until they are firm but not tight Tighten each screw Note All necessary hardware is inc...

Страница 11: ...t Attach a R10 and two E2 profiles to a 4A pediment rib connector and put them loosely in place Remove the plastic film from the PN51R side panel Make sure that the proper side faces out and put the p...

Страница 12: ...nt Attach a R10 and two E2 profiles to a 3A pediment rib connector and put them loosely in place Remove the plastic film from the PN51L side panel Make sure that the proper side faces out and put the...

Страница 13: ...ave purchased Attach a B2 profile and two E2 oval profiles to the left pediment Note The illustration is of a Sun Lounge with the entrance in the left pediment The assembly steps are identical Lock th...

Страница 14: ...n along the length of the profile Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained on page 2 Mo...

Страница 15: ...ns Note You will need the help of another person to lift the roof and put it in place Make sure that the roof is in the same orientation as the frame Lift the roof from both edges and walk through the...

Страница 16: ...he side channels of the columns Slide the top of the panel into the channel in the bottom of the roof Continue with the other PN1 panels Lower the panel towards the frame Continue with this procedure...

Страница 17: ...ncrete anchor set or expansion anchor not supplied Secure the frame to the wall using the BC frame clamp Continue attaching clamps where shown below Make sure that the center of the Sun Lounge roof do...

Страница 18: ...e of the panel into place with an RC9 glazing element Place one end in the channel and push it down along the length of the profile Make sure that the end of the RC glazing element is in line with the...

Страница 19: ...sides Remove the plastic before installation Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained...

Страница 20: ...sides Remove the plastic before installation Important In order to maintain the life of your greenhouse it is essential to insert glazing elements fully and completely using soapy water as explained o...

Страница 21: ...gth Align it with the channel of the column profile Push it in to seal the PN1 panel Use the GT1 pin glazing tool if needed Repeat for the other PN1 panels and the panels in the front pediment Note We...

Страница 22: ...a PN53 panel Slide the PN53 panel into the upper portion of the door Attach the Door12 Slider to complete the door Lock the parts of the door in place with pins Take the roll of GF sealer and pull ou...

Страница 23: ...llow it to slide easily Place the assembled door into the lower sliding track Push the door forward until it clicks under the upper sliding track Attach the LI1080 doorstop with the concave portion fa...

Страница 24: ...a PN53 panel Slide the PN53 panel into the upper portion of the door Attach the Door12 Slider to complete the door Lock the parts of the door in place with pins Take the roll of GF sealer and pull ou...

Страница 25: ...llow it to slide easily Place the assembled door into the lower sliding track Push the door forward until it clicks under the upper sliding track Attach the LI1080 doorstop with the concave portion fa...

Страница 26: ...n Lounge for sharp edges and trim with a razor knife if necessary It is important to clear your Sun Lounge of snow in the winter If you live in a hot climate where outside temperatures exceed 46 C 115...

Страница 27: ...25 Notes...

Страница 28: ...31 December 2009 Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email rion rion com homepage http www rion com...

Отзывы: