5. Remove the jumper from the connector P5 on the Main control PCB and
connect the OP delivery arm cable to that connector. Connect the other
cables to the Main control PCB. All the cables are marked.
6. Attach the chair gounding lead to the grounding terminal located on the
chair base.
7 Installing OP delivery arm
Installation manual
Planmeca Compact i3 31
Содержание Compact i3
Страница 1: ...PlanmecaCompact i3 installation manual EN 30020733 30020733...
Страница 68: ...12 Installing suction element 64 Planmeca Compact i3 Installation manual...
Страница 104: ......
Страница 105: ......