5
3. Wiring the Power Inputs
The Upper Panel of the Industrial Managed PoE+ Switch indicates a DC inlet power
socket and consists of one terminal block connector within 6 contacts. Please follow
the steps below to insert the power wire.
1. Insert positive/negative DC power wires into Contacts 1 and 2 for Power 1, or
Contacts 5 and 6 for Power 2.
IGS-20160HPT: DC 48-56V
DI 0 DI 1 DO 0 DO 1 GND GND
Fault
V1+
V2+
PWR2
PWR1
Dual power input is required
for maximum PoE loading.
Refer to user’s manual for
more details.
Input: 48-56V , 7.5A max.
Max. fault loading: 24V, 1A
1 2 3 4 5 6
1 2 3 4 5 6
Figure 3-1:
IGS-20160HPT Upper Panel
2. Tighten the wire-clamp screws for preventing the wires from loosening.
1
2
3
4
5
6
V1+ V1-
V2+ V2-
Power 1
Power 2
(DC1)
(DC2)
Model
Positive (+) Pin
Negative (-) Pin
IGS0-20160HPT
Pin 1 / 5
Pin 2 / 6