
User’s Manual of GS-5220 LCD Series
499
4.16.4 Port Sequential
This page allows the user to configure the PoE Ports started up interval time
. The PoE Port will start up one by one as
Figure 4-16-3
shows.
Figure 4-16-3:
PoE Port Sequential Power Up Interval Configuration Screenshot
The PoE port will start up after the whole system program has finished running.
The page includes the following fields:
Object
Description
•
Sequential Power up
Option
Allows user to enable or disable Sequential Power up function.
•
Sequential Power up
Interval
Allows user to configure the PoE Port Start Up interval time.
•
Sequential Power up
Port Option
There are two modes for Starting Up the PoE Port
By Port:
The PoE Port will start up by following Port number.
By Priority:
The PoE Port will start up by following the PoE Priority.
Содержание GS-5220 Series
Страница 1: ...User s Manual of GS 5220 LCD Series 1 GS 5220 Series L2 Gigabit 10 Gigabit Managed LCD Switch ...
Страница 18: ...User s Manual of GS 5220 LCD Series 18 ...
Страница 253: ...User s Manual of GS 5220 LCD Series 253 Figure 4 8 1 Multicast Service ...
Страница 254: ...User s Manual of GS 5220 LCD Series 254 Figure 4 8 2 Multicast Flooding ...
Страница 413: ...User s Manual of GS 5220 LCD Series 413 Figure 4 11 11 RADIUS Server Configuration Screenshot ...
Страница 487: ...User s Manual of GS 5220 LCD Series 487 Buttons Click to transmit ICMP packets Click to re start diagnostics with PING ...
Страница 506: ...User s Manual of GS 5220 LCD Series 506 The screen in Figure 4 16 6 appears Figure 4 16 6 PoE Schedule Screenshot ...
Страница 510: ...User s Manual of GS 5220 LCD Series 510 Figure 4 16 8 LLDP Configuration Screenshot ...