Job Overview
This chapter provides the instructions necessary to run, create, or edit a job.
Running a Job -
There are five major steps involved with running a job.
These steps need to be followed in the order listed below:
•
•
Settng Up Feeders and Loadng Materal
•
Makng Pre-Run Adjustments (f necessary)
•
•
This chapter explains each of these steps in detail. The content in this sec-
tion assumes that the job to be run exists in the Saved Jobs list in your sys-
tem.
NOTES:
• The Job Items list represents the order the items in your mail piece will be
shown. The first item below an outer envelope in the Job Items list will be the
top document when the contents are removed from the envelope.
• The Sheet and Insert icons in the Job Items list
do not
represent a single
Sheet or Insert, but rather the stack or pile of material that is loaded into a
Feeder.
• Follow the loading instructions each time before you run a job. The load-
ing orientation may change, depending on the Feeder assignment and job
settings. For instance, one Feeder may need to be loaded bottom first and
another top first.
• Feeder assignments are determined by the machine to best optimize the job.
This means they are assigned only after a job is selected. Also note that after
editing a job the Feeder assignments may change.
• The system automatically adjusts for most materials. However, if the throats
of your outer envelopes vary significantly, a manual adjustment may be
needed. Likewise, if different width or length sheets are fed from a HCSF
(High Capacity Sheet Feeder), there are adjustments to be made.
Creating a Job -
If the job does not exist, it must be created and saved by a
Supervisor/Manager. Refer to
in this chapter for more infor-
mation.
Editing a Job -
If the job requires modification it can be edited and run, but
must be saved by a Supervisor/Manager. Refer to
ter for more information.
Содержание DI900
Страница 1: ...Operator Guide US Canada English Version DI900 DI950 FastPac Document Inserting System ...
Страница 8: ...vi SV61311 Rev E Table of Contents This page is intentionally blank ...
Страница 10: ...vi SV61311 Rev E Contact Information List This page is intentionally blank ...
Страница 92: ...4 6 SV61311 Rev E 4 Advanced Operation This page is intentionally blank ...
Страница 112: ...5 20 SV61311 Rev E 5 Troubleshooting This page is intentionally blank ...
Страница 126: ...6 14 SV61311 Rev E 6 Reference This page is intentionally blank ...
Страница 180: ...8 36 SV61311 Rev E 8 Scanning This page is intentionally blank ...
Страница 188: ...A 8 SV61311 Rev E A Glossary This page is intentionally left blank ...
Страница 189: ...Index 1 SV61311 Rev E Index ...
Страница 195: ......