In the event towing lines are necessary, lines (rope) should be attached to both main gear struts as high up
on the tubes as possible. Lines should be long enough to clear the nose and/or tail by not less than 15 feet, and
a qualified person to ride in the pilot’s seat to maintain control by use of the brakes.
2-19. TAXIING. Before attempting to taxi the airplane, ground personnel should be checked out by qualified
pilot or other responsible person. Engine starting and shut-down procedures should be covered as well. When
it is ascertained that the propeller back blast and taxi areas are clear, apply power to start the taxi roll and
perform the following checks:
a.
Taxi forward a few feet and apply brakes to determine their effectiveness.
b. Taxi with propeller set in low pitch, high RPM setting.
c.
While taxiing, make slight turns to ascertain the effectiveness of steering.
d. Observe wing clearances when taxiing near buildings or other stationary objects. If possible station a
guide outside the airplane to observe.
e.
When taxiing on uneven ground, avoid holes and ruts.
f.
Do not operate the engine at high RPM when running up or taxiing over ground containing loose
stones, gravel or any loose material that may cause damage to the propeller blades.
2-20. EXTERNAL POWER RECEPTACLE.
2-21. OPERATION OF EXTERNAL POWER RECEPTACLE. The external power receptacle is located on the
right side of the fuselage aft of the wing. When using external power for starting or operation of any of the
airplanes equipment the following procedure should be followed:
a.
Turn aircraft MASTER SWITCH to OFF position.
b. Ensure that the RED lead of PEP (Piper External Power) kit jumper cable is connected to the
POSITIVE (+) terminal of the external 12-volt battery and that the BLACK lead is connected to the
NEGATIVE terminal.
c.
Insert the plug of jumper cable into the socket located on the aircraft fuselage.
d. Turn the aircraft MASTER SWITCH ON and proceed with NORMAL engine starting technique
e.
After the engine has been started, turn the MASTER SWITCH to the OFF position and remove the
jumper cable plug from the aircraft.
f.
Turn the aircraft MASTER SWITCH to the ON position and check the alternator ammeter for an
indiction of output. (DO NOT ATTEMPT ANY FLIGHT IF THERE IS NO INDICATION OF
ALTERNATOR OUTPUT.)
NOTE
If aircraft battery is weak, charging current will be high. Do not take off
until charging current falls below 20 amps. Do not take off with a
completely discharged battery as three volts is needed to excite the
alternator.
Issued: 12/15/76
1B11
*CHEROKEE ARROW III SERVICE MANUAL
HANDLING AND SERVICING
Содержание ARROW III
Страница 4: ...THIS PAGE INTENTIONALLY LEFT BLANK 1A4...
Страница 12: ...THIS PAGE INTENTIONALLY LEFT BLANK 1A12...
Страница 93: ...Figure 4 1 Aileron and Flap Installation Issued 12 15 76 1D21 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 94: ...Figure 4 2 Wing Installation Revised 2 13 89 1D22 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 95: ...Figure 4 2 Wing Installation cont Revised 11 21 80 1D23 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 101: ...Figure 4 4 Empennage Group Installation Revised 11 21 80 1E5 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 102: ...Figure 4 4 Empennage Group Installation cont Revised 11 21 80 1E6 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 104: ...Figure 4 5 Windshield Installation Typical Issued 12 15 76 1E8 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 107: ...Figure 4 7 Skin Materials and Thickness Issued 12 15 76 1E11 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 117: ...Figure 4 9 Control Surface Balance Tool Issued 12 15 76 1E21 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 124: ...Figure 4 15 Identification of Aircraft Fluid Lines Added 5 1 80 1F4 CHEROKEE ARROW III SERVICE MANUAL STRUCTURES...
Страница 130: ...TABLE V ll CABLE TENSION VS AMBIENT TEMPERATURE Revised 2 13 89 1F10 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 131: ...Figure 5 1 Control Column Assembly Revised 5 1 80 1F11 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 132: ...Figure 5 la Method of Installing Rod End Bearings Added 12 11 78 1F12 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 135: ...Figure 5 2 Aileron Controls Revised 11 21 80 1F15 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 142: ...Figure 5 6 Stabilator Controls Revised 5 1 80 1F22 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 147: ...Figure 5 8 Stabilator Trim Control Issued 12 15 76 1G3 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 149: ...Figure 5 9 Rudder and Steering Pedal Assembly Issued 12 15 76 1G5 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 151: ...Figure 5 10 Rudder Controls Revised 12 11 78 1G7 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 157: ...Figure 5 15 Flap Controls Interim Revision 2 21 95 1G13 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 162: ...Figure 5 20 Fabricated Stabilator Rigging Tool Issued 12 15 76 1G18 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 163: ...Figure 5 21 Fabricated Rudder Rigging Tool Issued 12 15 76 1G19 CHEROKEE ARROW III SERVICE MANUAL SURFACE CONTROLS...
Страница 171: ...lH3 INTENTIONALLY LEFT BLANK...
Страница 172: ...lH4 INTENTIONALLY LEFT BLANK...
Страница 178: ...Figure 6 2 Hydraulic System Installation Revised 2 13 89 1H10 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 188: ...THIS PAGE INTENTIONALLY LEFT BLANK Revised 2 13 89 1H20 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 190: ...Figure 6 6 Gear Back up Extender Actuator Revised 2 13 89 1H22 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 195: ...Figure 6 7 Nose Gear Actuating Cylinder Revised 2 13 89 1I3 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 198: ...Figure 6 9 Main Gear Actuating Cylinder Revised 2 13 89 1I6 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 212: ...GRIDS lI20 AND lI21 INTENTIONALLY LEFT BLANK Revised 2 13 89 1I20 CHEROKEE ARROW III SERVICE MANUAL HYDRAULIC SYSTEM...
Страница 234: ...Figure 7 11 Aligning Main Gear Revised 2 13 89 1J19 CHEROKEE ARROW III SERVICE MANUAL LANDING GEAR AND BRAKE SYSTEM...
Страница 254: ...Figure 7 19 Removal of Anchor Bolt Revised 2 13 89 1K15 CHEROKEE ARROW III SERVICE MANUAL LANDING GEAR AND BRAKE SYSTEM...
Страница 259: ...Figure 7 23 Toe Brake Installation Revised 2 13 89 1K20 CHEROKEE ARROW III SERVICE MANUAL LANDING GEAR AND BRAKE SYSTEM...
Страница 264: ...Figure 7 26 Bleeding Brakes Revised 2 13 89 1L1 CHEROKEE ARROW III SERVICE MANUAL LANDING GEAR AND BRAKE SYSTEM...
Страница 286: ...THIS PAGE INTENTIONALLY LEFT BLANK Revised 2 13 89 2A8...
Страница 292: ...Figure 8 3 Propeller Installation Revised 8 31 77 2A14 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT CONTINENTAL...
Страница 298: ...Figure 8 6 Engine Installation Revised 12 11 78 2A20 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT CONTINENTAL...
Страница 323: ...Figure 8 28 Ignition Schematic Revised 8 31 77 2B21 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT CONTINENTAL...
Страница 330: ...Figure 8 33 Engine Controls Revised 8 31 77 2C4 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT CONTINENTAL...
Страница 347: ...Figure 8A 1 Propeller Installation Hartzell Revised 5 1 80 2C21 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT LYCOMING...
Страница 354: ...Figure 8A4 Engine Installation PA 28R 201 Revised 10 18 83 2D4 CHEROKEE ARROW III SERVICE MANUAL POWER PLANT LYCOMING...
Страница 385: ...Figure 9 1 Fuel System Diagram PA 28R 201 Issued 12 15 76 2E11 CHEROKEE ARROW III SERVICE MANUAL FUEL SYSTEM...
Страница 387: ...Figure 9 2 Fuel System Diagram PA 28R 201T Revised 2 13 89 2E13 CHEROKEE ARROW III SERVICE MANUAL FUEL SYSTEM...
Страница 389: ...Figure 9 3 Fuel Sender Units Installation Revised 2 13 89 2E15 CHEROKEE ARROW III SERVICE MANUAL FUEL SYSTEM...
Страница 409: ...Figure 10 1 Instrument Panel Typical Revised 2 13 89 2F11 CHEROKEE ARROW III SERVICE MANUAL INSTRUMENTS...
Страница 412: ...Figure 10 2 Pitot Static System Revised 2 13 89 2F14 CHEROKEE ARROW III SERVICE MANUAL INSTRUMENTS...
Страница 414: ...Figure 10 3 Vacuum Auxiliary Vacuum Installation Revised 2 13 89 2F16 CHEROKEE ARROW III SERVICE MANUAL INSTRUMENTS...
Страница 482: ...Figure 11 44b Ignition Switch Revised 2 13 89 2I12 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 483: ...Figure 11 45 Terminal Block Revised 2 13 89 2I13 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 498: ...TABLE XI VI ELECTRICAL SYMBOLS Revised 2 13 89 2J4 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 506: ...Figure 11 62 Instrument Lights PA 28R 201T Revised 2 13 89 2J12 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 507: ...Figure 11 63 Alternator and Starter PA 28R 201 Revised 2 13 89 2J13 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 510: ...Figure 11 65 Fuel Pump PA 28R 201T Revised 2 13 89 2J16 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 511: ...Figure 11 66 Landing Gear PA 28R 201 201T Revised 2 13 89 2J17 CHEROKEE ARROW III SERVICE MANUAL ELECTRICAL SYSTEM...
Страница 528: ...INTENTIONALLY LEFT BLANK 2K10 THRU 2L24 2K10...
Страница 542: ...Figure 14 4 Manifold Set Operation Revised 2 13 89 3A14 CHEROKEE ARROW III SERVICE MANUAL ACCESSORIES AND UTILITIES...
Страница 578: ...Figure 14 16 Fixed Oxygen System Revised 2 13 89 3C2 CHEROKEE ARROW III SERVICE MANUAL ACCESSORIES AND UTILITIES...
Страница 580: ...Figure 14 18 Oxygen Tubing Installation Revised 2 13 89 3C4 CHEROKEE ARROW III SERVICE MANUAL ACCESSORIES AND UTILITIES...
Страница 594: ...INTENTIONALLY LEFT BLANK 3C18 THRU 3L24...